The Salton Sea: An account of Harriman's fight with the Colorado River — John Shaqi
The Salton Sea: An account of Harriman's fight with the Colorado RiverKennan, George
History
The Salton Sea: An account of Harriman's fight with the Colorado River
Kennan, George
Harriman, Edward Henry, 1848-1909; Imperial Valley (Calif. and Mexico); Salton Sea (Calif.)
Thus ended, in almost complete failure, the fifth
attempt to control the Colorado. The river had been barred in one
channel, but it burst through another, carrying with it a 200-foot
head-gate which represented four months of labor and an expenditure of
$122,000.
Mr. Harriman and the Southern Pacific engineers were disappointed but
not disheartened. The steel-and-concrete head-gate at Andrade had
been ready for use since June, and powerful dredges were set at work
clearing out and enlarging the four miles of silted-up canal south of
it, so that water might be furnished to the Imperial Valley by that
route while another attempt was being made to close completely both the
Rockwood by-pass and the original intake.
An inspection of the rock-fill dam, which had been left exposed by
the diversion of the river, showed that the objections made to a
structure of this kind were not well founded. The brush-mattress had
not been broken by the weight of the rocks; the rocks themselves had
not sunk out of sight in the soft silt of the bottom, and the dam had
not been breached or seriously injured. It leaked a little, but its
good condition in other respects suggested the possibility of quickly
closing the by-pass and the intake with rock barriers of this type.
Additional trestles were built across both waterways; ten trains of
flat cars and “battleships” were set at work bringing rock from three
or four different quarries, and the laboring force was increased to
about a thousand men with seven hundred horses and mules. Operations
were pushed night and day, and in a little more than three weeks, high
rock-fill dams were built across both intake and by-pass, and were
connected by massive levees so as to make a continuous barrier about
half a mile in length. Leakage through the dams was stopped by facing
them with gravel and clay, forced into the interstices and puddled
with streams of water from powerful pumps, and the levees at both ends
were connected with those that had previously been built up and down
the river by the California Development Company. In the course of the
work there were used, first and last, about three thousand carloads of
rock, gravel and clay, while 400,000 cubic yards of earth were moved by
dredges and teams.
[Illustration: First Closure of Crevasse, Nov. 4, 1906]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account