The Salton Sea: An account of Harriman's fight with the Colorado RiverKennan, George
History
The Salton Sea: An account of Harriman's fight with the Colorado River
Kennan, George
Harriman, Edward Henry, 1848-1909; Imperial Valley (Calif. and Mexico); Salton Sea (Calif.)
“For three weeks, two divisions of the Southern Pacific system,
embracing about twelve hundred miles of main line, were practically
tied up because of our demands for equipment and facilities. We had
a thousand flat cars exclusively in our service, and shipping from
Los Angeles’ seaport--San Pedro--was practically abandoned for two
weeks until we returned a considerable portion of the equipment. It
was simply a case of putting rock into that break faster than the
river could take it away.... In fifteen days after we got the trestle
across and dumped the first carload of rock we had the river stopped.
In that time I suppose we handled rock faster than it was ever handled
before.... We hauled it from Patagonia, Arizona, four hundred and
eighty five miles, over two mountain passes; from Tacna, sixty miles
to the east; from three other quarries--one on the Santa Fé, one on
the Salt Lake road, and one on the Southern Pacific--all near Colton,
two hundred miles to the west, and over the San Gorgonio Pass.... We
brought in about three thousand flat cars loaded with rock from these
immense distances, and we put in, all together, about 80,000 cubic
yards of rock in fifteen days.”
But the work of the Southern Pacific engineers was not confined solely
to the closing of the crevasse. In order to prevent a future break in
some other part of the irrigation company’s defensive system, they were
compelled to extend their branch railway, and to build or reinforce
levees all up and down the river. Describing this work soon after its
completion in 1907, the Director of the U. S. Reclamation Service said:
“There now extends from the head works in the United States along the
river, between it and the canal, a double row of dikes, the outer
one being occupied by a railroad. These extend in an unbroken line for
a dozen miles near the river and shut it off from the lowlands to the
west. The river side of this dike is protected by a thick layer of
gravel, and the railroad affords immediate access to all parts, so that
if menaced by the cutting of the banks it will be possible to bring
men and materials to check the floods from encroachment upon the dike
itself. Secondary dikes or cross levees run from the main structure
to certain subsidiary works, so that if the outer main dike is broken
or water flows through, this will be ponded, for a while at least,
against the inner line of defense, thus affording time to assemble the
necessary equipment to fight another intrusion.”
[Illustration: Hind-Clarke Dam by which Crevasse was Finally Closed in
January 1907]
[Illustration: Railroad Track on Reconstructed Levee]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account