The battalion remained a few days in this district, and when not
actually in the outpost line and digging trenches, we were taken out in
front, a company at a time, to act as a protection to the E.L.C. who
were engaged upon railway construction. Whilst on this work we got our
first glimpse of El Arish, the goal to be gained after this heavy
striving across the desert. The Turks were supposed to be holding a
strong position between ourselves and the town, and the idea seemed to
be to push the railway as far as possible, and then eject the enemy so
that work could proceed. Our men were thoroughly impressed with the
wonderful rapidity with which these "Gyppies" accomplished their task.
They were divided up into gangs, each in charge of another native who
had been raised to the dignity of two stripes and a stick. The stick he
used freely on the men who failed to keep up his standard of work. Using
their curious adze-like shovels they pulled the sand into baskets and
ran away with it to where it was required, and whilst they toiled a
simple but noisy refrain was sung to the leadership of the "Ganger." The
whole spectacle presented a seething mass of rapidly-moving, blue
smocked, brown figures, busily working on the bright yellow sand. The
result of four hours of this sort of thing would produce about 500 yards
of good level track including shallow cuttings and embankments. Then the
train would arrive with more sleepers and rails and these would be
carefully but quickly laid in position.
Another job we had to do in this neighbourhood was digging wells. When
"C" Company went off for a couple of days to do this they discovered
what a formidable business it was. It was necessary to go down to a
depth of about twenty feet, and as the well was sited in very soft sand
the task can be imagined. A huge hole, about forty feet square had to be
made to allow for the slope of the sand, and the deeper we went, the
higher grew the mountains of sand all round the hole, so that the men
had to be arranged on tiers above one another. In this way a shovel full
of sand from the bottom travelled up through various pairs of hands
before it was finally thrown clear. This tedious business continued
until water was struck, and then a corrugated iron frame was sunk at the
bottom, and the tall sides of the well built upon it. After this all the
sand that had been so laboriously chucked out, was heaved back again. A
pump was fixed by the R.E. and troughs made along side, to be filled as
often as the well could furnish sufficient water (in this case twice a
day) for the use of camels or horses.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account