The stone to be set being hung in the tackle, and its bed of mortar
spread, was then lowered into its place, beaten with a heavy wooden
mall, and levelled with a spirit-level; and the stone being
accurately brought to its marks, was considered as set in its proper
position. The next thing was to keep it there, notwithstanding the
utmost violence of the sea might beat upon it before the mortar was
thoroughly hard and dry. Therefore the carpenter dropped into a
couple of vertical grooves, which had been previously cut in "the
waist" of the stone, each an inch deep and three inches wide, two
oaken wedges, one upon its head, the other with its point downwards,
so that the two in each groove would lie heads and points.
[Illustration: Foundation wedges.] With an iron bar, about two inches
and a half broad, a quarter of an inch thick, and two feet and a half
long, he then drove down one wedge upon the other--very gently at
first, so that the opposite pairs of wedges, being equally tightened,
would equally resist each other, and the stone would therefore keep
its place. In like manner, a couple of wedges were pitched at the
top of each groove; the dormant wedge (_i.e._, the one with the point
upward) being held in the hand, while the drift wedge (i.e., the one
with the point downward) was driven with a hammer. So much as
remained above the upper surface of the stone was cut away with saw
or chisel; and, generally, a couple of thin wedges were driven very
moderately at the butt-end of the stone, whose tendency being to
force it out of its dove-tail, they would, by moderate driving,
assist in preserving the steadiness of the entire mass, in opposition
to any violent agitation arising from the sea.
[Sidenote: Progress of the work.]
The stone thus firmly secured, a certain portion of mortar was
liquefied, and the joints having been carefully "pointed," this
liquid cement was poured in with iron ladles, so as to occupy every
vacant space. The heavier part of the cement naturally fell to the
bottom, while the fluid was absorbed by the stone. The vacancy thus
left at the top was repeatedly refilled, until all remained solid;
then the top was pointed, and, where necessary, defended by a layer
of plaster.
The whole of the foundation having thus been brought to a proper
level, some other means were required to secure a similar degree of
solidity for the superstructure.
A hole, one foot square, was accordingly cut right through the middle
of the central stone in the sixth course; and at equal distances in
the circumference were sunk eight other sockets, each one foot
square, and six inches deep. A strong plug of hard marble, also one
foot square, but twenty-two inches long, was driven into the
aforementioned central cavity, and set fast with mortar and wedges.
This course, however, was only thirteen inches in depth; consequently
the marble plug rose nine inches above the surface.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account