It was one of the most difficult works, we are told, which, up to
that time, had been constructed in Great Britain. The engineer's
resources were severely tested by the occurrence of rocks and
quicksands: in some places the canal was carried over deep rivers, in
others along embankments exceeding twenty feet in height. It
traverses numerous roads and scores of rivulets; besides the streams
of the Luggie (celebrated by the peasant-poet David Gray), and the
Kelvin (immortalized by Burns). The bridge over the latter is 275
feet long and 68 feet high. The depth of the canal averages 8 feet.
The total cost of the undertaking did not amount to £200,000.
[Sidenote: The bridge at Coldstream.]
Smeaton's next engagement was to construct a bridge across the Tweed
at Coldstream. It consists of five principal arches, of which the
central has a span of 60 feet 8 inches; the two lateral, of 60 feet 5
inches each; and the two land or side arches, 58 feet. It was
completed at a total cost of about £6000; and opened in October 1766,
having been upwards of three years in building. It will serve to
show the great advance that has been made in engineering science
since the days of Smeaton, when we state that a similar bridge could
now be erected in nine months; though, owing to the rise in wages and
in the price of materials, at a much greater cost.
Smeaton also furnished the design for the bridge over the river
Deveron, near Banff, in Scotland. It consists of seven arches,
segments of circles, and measures 410 feet in length, and 20 feet in
width. It resembles, in its leading features, the bridge at Perth;
and its simple yet graceful aspect, added to the exceeding beauty of
its position, renders it a much-admired object, and one of great
pictorial interest.
[Sidenote: The bridge at Hexham.]
Smeaton built only one bridge in England, and, strange to say, it was
his only failure. He was requested, in 1777, to furnish a design for
a bridge to be erected across the Tyne at Hexham; and a very handsome
structure, of nine arches, it proved to be. But it had scarcely been
finished before a subsidence took place in the foundation of one of
the piers; and an attempt was made to remedy the defect by
"sheet-piling," and by filling up the cavities in the river's bed
with rough rubble-stones.
[Sidenote: A great misfortune.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account