World War, 1914-1918 -- Naval operations -- Submarine
I must just hark back to the question of the U-boat here, as the
Inspection Commissions in Germany that are seeing to the handing over
or destruction of the U-boats bring back their reports here, and their
reports are full of interest, though perhaps they contain little that
is news to the Admiralty. There are now 135 German submarines in
England, and there are more to come yet. The building-yards of Germany
show that a huge effort was to have been made along the lines of
submarine war in the spring and summer of 1919. Every available yard
was working at full power at the date of the cessation of hostilities,
and the work was almost entirely on submarine construction. The only
other work being done was on new and more powerful destroyers and on
standard merchant ships--the latter for after-the-war reconstruction.
Yards that had never before done warship work of any kind were fully
employed on building small submarines. The big yards were given all the
new submarine-cruiser work to do. The submarine cruisers were a
comparative failure on trials, as were also the big submarine
mine-layers of the U 118 class; this must have been a sad
disappointment to the enemy, as one can judge by the number of big
boats preparing that he had set his heart on a campaign of thorough
frightfulness on the American coast in the spring. Work on the new big
surface ships had stopped in the spring of 1918, partly owing to the
shortage of nickel and chiefly owing to their whole stake having been
put on submarines and not on the Fleet. The German mentality never
seems to have grasped the fundamental rule of sea-fighting--that
commerce-destruction will never win a war, and that only the defeat or
mastery of the main enemy fleet can bring command of the sea.
Such yards as the two at Hamburg (Vulcan and Blohm & Voss) are typical
of the method of construction. On November 11 these two yards had
seventy-two submarines under construction. At the same time at Blohm
& Voss's yard the battle-cruiser _Mackensen_ lay abandoned in the
water just as she had been launched in the spring of 1918, and the
battleship _Ersatz Freya_ lay half-finished on the building-slip. The
submarines were on the slips in rows--each row representing a group of
perhaps seven boats of the same class. Lying alongside each row were
parts and fittings waiting to be built in: for instance, seven bows
(complete with sterns and torpedo-tube pads), seven sterns (complete
with hydroplane-guards, etc.), seven bow top-strakes, seven stern
top-strakes, etc.--in fact, one was reminded strongly of what one had
heard of American motor-car factories. The whole idea was of quick and
standardised production, and the two points that occurred at once to
the observer were--"There would have been a deuce of a rush of new
stuff into commission in the spring," and then, "How on earth were
they going to provide skilled crews for such a lot of boats all at
once?"
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account