Such a length of time had elapsed since the expedition left Newfoundland
that the staff at Foilhommerum, under the superintendence of Mr. James
Graves, felt they were almost hoping against hope. Suddenly, on a Sunday
morning at a quarter to six, while the tiny ray of light from the
reflecting instrument was being watched, the operator observed it moving
to and fro upon the scale. A few minutes later the unsteady flickering
was changed to coherency. The long-speechless cable began to talk, and
the welcome assurance arrived, "Ship to shore; I have much pleasure in
speaking to you through the 1865 cable. Just going to make splice." Glad
tidings were also sent from the ship via Valentia to London, and, by
means of the 1866 cable, to Newfoundland and New York. Thus it happened
that those being tossed about in a stormy sea held conversation with
Europe and America at one and the same time.[67]
"_Putting Through._"--The recovered end was spliced on without delay to
the cable on board, and the same morning at seven o'clock the Great
Eastern started paying out about 680 nautical miles of cable toward
Newfoundland. On September 8th, when only thirteen miles from the Bay of
Heart's Content, just after receiving a summary of the news in The Times
of that morning, the tests showed a fault in the cable. The mischief was
soon found to be on board the ship, and caused by the end of a broken
wire, which, bending at right angles under the weight of the men
employed in the tanks, had been forced into the core. This occurrence
explained the probable cause of the faults (of same character) which had
shown themselves during paying out the year before, tending to remove
all suspicion of malicious intent. The faulty portion having been cut
out, and the splice made without delay, paying out again proceeded,
finishing the same day at eleven o'clock in the forenoon. The Medway
immediately set to work laying the shore end, and that evening a second
line of communication across the Atlantic was completed. The total
length of this cable, commenced in 1865, was 1,896 miles; average depth,
1,900 fathoms.
[Illustration: FIG. 42.--S.S. Great Eastern with 1865 Cable at Bows;
Depth, 2 Miles.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account