"Between the two brake-drums and the stern of the vessel, the cable was
led under the grooved wheel, O, of the dynamometer. This wheel had a
weight attached to it, and could be moved up or down in an iron frame.
If the strain upon the cable was small, the wheel would bend the cable
downward, and its index would show a low degree of pressure; but
whenever the strain increased, the cable, in straightening itself, would
at once lift the dynamometer-wheel with the indicator attached to it,
which showed the pressure in hundredweights and tons. The amount of
strain with a given weight upon the wheel, G, was determined by
experiments, and a hand-wheel in connection with the levers of the
paying-out machine was placed immediately opposite the dynamometer; so
that, directly the indicator showed strain increasing, the person in
charge could at once, by turning the hand-wheel, lift up the weights
that tightened the friction-straps, and so let the cable run freely
through the paying-out machine. Although, therefore, the strain could be
_reduced_--or entirely withdrawn--in a moment, it could not be
_increased_ by the man at the wheel. The cable in coming from the tanks,
passed under a lightly weighted 'jockey,'[22] J, pulley. This
arrangement, while leading the line on to the drums, at the same time
checked it slightly. From here it was guided by a grooved pulley, or
V-sheave,[23] L, along the tops of both drums, at B, then three times
round them, and hence over another V-sheave, F, and on to the
dynamometer. From this the cable was led over a second pulley, and so
into the sea by the stern-sheaves."[24]
This entire apparatus--simplified as regards the brake--has since been
universally adopted for submarine-cable work,[25] with the exception
that a single-flanged drum, fitted with a sort of plow, skid, or
knife-edge--to guide or "fleet" the incoming turn of cable correctly on
to the drum--is now used in place of the grooved sheave, or sheaves.
As soon as the new machinery was constructed, all the engineering staff
gathered together for the purpose of thoroughly acquainting themselves
with its working. Mr. F. C. Webb, having engagements elsewhere, had been
replaced by Mr. W. E. Everett, U.S.A., who had been chief marine
engineer of the Niagara. Mr. Everett was to have charge of the machinery
on the laying vessel, while Mr. Woodhouse controlled the cable
operations.
[Illustration: FIG. 18.--Bright's Paying-out Gear, 1858.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account