absence of efficient holding-back gear--caused it to run out too
rapidly, notwithstanding the slight depth (some 30 fathoms) encountered.
Added to this, the tugs drifted with the wind and tide. Thus when the
vessels arrived within about a mile of the French coast no more cable
was left on board, and a fresh length had to be procured and spliced on
before the line was complete. This cable proved a lasting success: it
underwent numerous and extensive repairs, and it was only quite recently
that its abandonment took place.
_Other Early Cables._--The success of Crampton's line gave considerable
impetus to submarine telegraphy. Similar enterprises sprung up on all
sides; but many failures occurred before these operations came to be
regarded as ordinary industrial undertakings. In the course of the
following year (1852) three unsuccessful attempts were made to establish
telegraphic communication between England and Ireland. In the
first--between Holyhead and Howth--the cable was not heavy enough to
contend with the rough bottom, and strong currents and disturbances from
anchors experienced in these waters; but this undertaking is remarkable
as being the only instance in which an effort was made to do without any
intermediate serving between the insulated conductor and the iron
sheathing. In the second attempt--between Port Patrick (Scotland) and
Donaghadee (Ireland)--the cable consisted of a central copper conductor
covered first with india-rubber, then with gutta-percha, and then hemp
outside all. This cable, being far too light, was actually carried away
by the strong tidal currents and even broken into pieces during laying.
In the third endeavor, between the same two points, the arrangements for
checking the cable while paying out being again inadequate, there was
not sufficient to reach the farther shore. However, in 1853, a heavy
cable, weighing 7 tons per mile, with six conductors, was successfully
laid for the Magnetic Telegraph Company by the late Sir Charles
Bright.[7] This was in upward of 180 fathoms--the deepest water in which
a cable was laid for some time--and proved a permanent success, forming
the first establishment of telegraphic communication with Ireland. Only
a year elapsed before it became evident that another cable was required
to meet the traffic between England and the Continent, and an additional
line was laid from Dover to Ostend. Anglo-Dutch and Anglo-German cables
followed in due course; and in less than ten years from the commencement
of its operations over the first Channel cable, the Submarine Telegraph
Company (since absorbed by the state) was working at least half a dozen
really excellent cables, varying from 25 to 117 miles in length,
connecting England with the rest of Europe. During the next few years
submarine communication was established between Denmark and Sweden, as
well as between Italy, Corsica, and Sardinia; and between Sardinia and
the north coast of Africa; but where successful, the measures adopted
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account