The Three Choirs: A Handbook to the Cathedrals of Gloucester, Hereford, and Worcester: A Complete Description of the Buildings, a History of Each Diocese and Biographical Notices of the BishopsKing, R. J. (Richard John)
Religion
The Three Choirs: A Handbook to the Cathedrals of Gloucester, Hereford, and Worcester: A Complete Description of the Buildings, a History of Each Diocese and Biographical Notices of the Bishops
A nunnery was founded at Gloucester in the year 681, by Osric, a
“minister” or “sub-regulus” of Ethelred, King of Mercia. Three abbesses
ruled it successively until 767, after which the convent was dispersed.
Beornulph of Mercia refounded it, about 821, for secular priests,--who,
in 1022, were replaced by Benedictine monks. The Saxon Chronicle (A.D.
1058) records the “hallowing” of the monastery by Ealdred, Bishop of
Worcester. In 1088 this building was destroyed by fire, and a new church
was commenced by Abbot Serlo, which was completed and dedicated in
1100[2]. Two years afterwards this church suffered much from fire; and
still more in 1122, when the Saxon Chronicle asserts that “in Lent-tide
... the town of Gloucester was burnt while the monks were singing their
mass, and the deacon had begun the gospel ‘Præteriens Jesus.’ Then came
the fire on the upper part of the steeple, and burned all the monastery,
and all the treasures that were there within, except a few books and
three mass-robes.” This injury, according to Froucester’s Chronicle, was
repaired by the offerings of the faithful; but the abbey suffered again
from fire in 1179 and 1190. The church was re-dedicated to St. Peter,
in 1239, by Walter de Cantilupe, Bishop of Worcester. In 1242 the nave
roof was completed. Abbot THOKEY (1306-1329) built the _south aisle_ of
the nave in 1318. It was during his abbacy that the body of Edward II.
was interred in the church; and it was owing to the great value of the
offerings made at his tomb that a series of works was commenced, which
form one of the most peculiar features of this cathedral. Under the
succeeding Abbot, WYGEMORE, (1329-1337,) the Norman walls of the _south
transept_ (called St. Andrew’s aisle) were cased with tracery; ADAM DE
STANTON, abbot from 1337 to 1351, constructed the vaulting of the
_choir_, and the stalls on the prior’s side; and Abbot HORTON
(1351-1377) completed the high altar with the choir, and the stalls on
the abbot’s side; together with the casing of St. Paul’s aisle, (the
_north transept_). This abbot also commenced the great _cloister_, which
Walter FROUCESTER (1381-1412) completed. Abbot MORWENT (1420-1437)
erected the _west front_, the _south porch_, and two western bays of the
nave. Abbot SEABROOKE (1450-1457) built the existing _tower_. Abbot
HANLEY (1457-1472) began the _Lady-chapel_, which Abbot FARLEY
(1472-1498) completed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account