The Three Choirs: A Handbook to the Cathedrals of Gloucester, Hereford, and Worcester: A Complete Description of the Buildings, a History of Each Diocese and Biographical Notices of the BishopsKing, R. J. (Richard John)
Religion
The Three Choirs: A Handbook to the Cathedrals of Gloucester, Hereford, and Worcester: A Complete Description of the Buildings, a History of Each Diocese and Biographical Notices of the Bishops
The cathedral, up to this period, had been a Norman and transition
Norman building. In 1221, on St. Andrew’s Day, during a great storm, the
two “lesser towers” of Worcester fell. There is no evidence that the
Norman nave terminated in western towers; and Professor Willis has
suggested that these “lesser towers” may have flanked the Norman choir
of Worcester, like those still remaining at Canterbury. Their fall may
have injured the choir, and the ruin thus effected may have assisted the
determination of the Bishop and Convent to expend the wealth which was
still pouring in before the shrine of St. Wulfstan, in the erection of a
more sumptuous church. At any rate, in 1224 the existing choir and
Lady-chapel were begun; Bishop William of Blois laying the foundations
of the new work of the east front; (_novum opus frontis_[61]). In 1281
the sacrist of the monastery received from the executors of Nicholas of
Ely, Bishop of Winchester, a sum of sixty marks, the Bishop’s legacy
toward the “rebuilding of the tower,”--no doubt the central tower of the
cathedral,--which was not, however, effected for nearly a century,
(1374). In the meantime, the Norman nave was partly removed and rebuilt.
Bishop Cobham vaulted the north aisle of the nave between 1317 and 1321;
and in 1377 Bishop Wakefield vaulted the nave itself.
II. These dates will assist us in examining the existing cathedral. Of
ST. WULFSTAN’s Church, begun as we have seen, in 1084, the crypt, which
extends at present under the choir and aisles, is the only certain
relic. But portions of Norman work, belonging, according to Willis, to
the first three quarters of the twelfth century, remain in the nave, at
the western end of the choir, and in the walls of the great transept.
The two westernmost bays of the nave are transition Norman, and there is
Norman work of the same period (the last quarter of the twelfth century)
in the great transept.
The choir, retro-choir, and Lady-chapel, with the choir-aisles and the
eastern transepts, are _Early English_, and were commenced in 1224. The
nave, with the exception of the two western bays, is of later date,
_Decorated_, (1317-1327,) on the north side; and Decorated with a strong
tendency to Perpendicular (_circ._ 1360?) on the south. The central
tower is also Decorated, and was no doubt the tower for which the
legacy of Bishop Nicholas of Winchester (1281) was intended. The
cloisters are Perpendicular.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account