The war against Germany: Europe and adjacent areasHunter, Kenneth E.
History
The war against Germany: Europe and adjacent areas
Hunter, Kenneth E.
World War, 1939-1945 -- Campaigns -- Western Front; World War, 1939-1945 -- Pictorial works
A PORTION OF CHERBOURG showing the inner harbor and docks. Fort
du Roule, built high and secure into a steep rock promontory
which stands immediately back of the city, dominated the entire
harbor area. It was primarily a coastal fortress but was also
defended against a ground attack. The P-47’s which bombed the
fort did little damage to the subterranean tunnels housing the
big guns. The fort was finally taken by infantry troops armed
with machine guns, mortars, grenades, pole charges, and rifles.
The fort surrendered in sections and it was not until late on
25 June that the complete surrender was accomplished. After the
rest of the city had been taken the Arsenal still held out.
This structure, partially protected by a moat, was high-walled
and well-armed. On 27 June the Arsenal surrendered bringing to
an end all organized resistance in the city. With the fall of
the city every effort was made to clear the harbor and repair
docking facilities as quickly as possible.]
[Illustration: FRANCE
THE FIRST SHIP-TO-SHORE GASOLINE LINE, put in operation at
Cherbourg. During the assault phase the Allied forces relied on
canned gasoline, but by 3 July bulk supply was being introduced
by ship-to-shore pipeline which brought in part of the large
quantities of gasoline necessary to the Allied forces.]
[Illustration: FRANCE
ORDNANCE MEN CUTTING ANGLE-IRON with acetylene torches (top). An
M5 light tank equipped with a hedgerow cutter (bottom). During
the fighting in Normandy armored vehicles found the hedgerows a
serious obstacle which they could neither cross over nor break
through. An enlisted man of an Ordnance unit in Normandy devised
the method of attaching to the front of tanks rake-like cutters
improvised from heavy angle-iron salvaged from the underwater
beach obstacles which the Germans had placed to wreck landing
craft. During a period of 48 hours maintenance companies of
the Ordnance Department turned out 300 of these cutters, which
enabled the tanks to open passageways through the hedgerows of
Normandy, and play an important part in the advance leading to
the break-through at Saint-Lô.]
[Illustration]
[Illustration: FRANCE
.30-CALIBER BROWNING MACHINE GUN M1919A4 being fired through an
opening in a hedgerow by an infantryman. The July offensive,
one of the most difficult and bloody phases of the Normandy
Campaign and known as the Battle of the Hedgerows, was conducted
from 7 to 20 July 1944. Four U. S. Army corps, ultimately
employing twelve divisions, were involved in the effort. German
reinforcements stiffened, particularly in the hills protecting
Saint-Lô, and the U. S. forces in the Cotentin Peninsula fought
their way southward, alongside the U. S. troops east of the Vire
River, to win ground for mounting the attack which was to break
through the German defenses at the end of the month of July.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account