The heating for forging should be done preferably in a pipe or
muffle furnace but if this is not convenient use a good clean fire
with plenty of fuel between the blast pipe and the tool. Never
allow the tool to soak after the desired forging heat has been
reached. Do not heat the tool further back than is necessary to
shape the tool, but give the tool sufficient heat. See that the
back of the tool is flatly dressed to provide proper support under
the nose of the tool.
HARDENING HIGH-SPEED STEEL.--Slowly reheat the cutting edge of
the tool to a cherry red, 1,400 deg.F., then force the blast so as
to raise the temperature quickly to a full white heat, 2,200 to
2,250 deg.F., that is, until the tool starts to sweat at the cutting
face. Cool the point of the tool in a dry air blast or preferably
in oil, further cool in oil keeping the tool moving until the tool
has become black hot.
To remove hardening strains reheat the tool to from 500 to 1,100 deg.F.
Cool in oil or atmosphere. This second heat treatment adds to the
toughness of the tool and therefore to its life.
GRINDING TOOLS.--Grind tools to remove all scale. Use a quick-cutting,
dry, abrasive wheel. If using a wet wheel, be sure to use plenty
of water. Do not under any circumstances force the tool against
the wheel so as to draw the color, as this is likely to set up
checks on the surface of the tool to its detriment.
FOR MILLING CUTTERS AND FORMED TOOLS
FORGING.--Forge as before.--ANNEALING.--Place the steel in a pipe,
box or muffle. Arrange the steel so as to allow at least 1 in.
of packing, consisting of dry powder ashes, powdered charcoal,
mica, etc., between the pieces and the walls of the box or pipe.
If using a pipe close the ends. Heat slowly and uniformly to a
cherry red, 1,375 to 1,450 deg.F. according to size. Hold the steel at
this temperature until the heat has thoroughly saturated through
the metal, then allow the muffle box and tools to cool very slowly
in a dying furnace or remove the muffle with its charge and bury
in hot ashes or lime. The slower the cooling the softer the steel.
The heating requires from 2 to 10 hr. depending upon the size of
the piece.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account