Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
Engineering $ 2,925.64
Guarding S. P. & S. Ry. tracks 527.02
Right-of-way damages 73.56
Rental on State Industrial Ry. track furnished
contractor 138.00
Payments to contractor for work as follows:
Clearing and grubbing $ 2,085.00
Common excavation, 20,106.5 cu. yds. at 45c 9,047.92
Intermediate excavation, 3,534.9 cu. yds.
at 70c 2,474.43
Solid rock excavation, 11,947.2 cu. yds.
at $1.15 13,739.28
12-inch reinforced concrete pipe, 560 lin.
ft. at $1.50 840.00
24-inch reinforced concrete pipe, 92 lin. ft.
at $3.30 303.60
36-inch reinforced concrete pipe, 80 lin. ft.
at $5.30 424.00
Overhaul per 100 lin. ft., 18,032 cu. yds. at
2c 360.64
Force account--
Replacing trestle for Warren Packing Co.'s
plant, Goble 256.00
Borrowing approximately 400 cu. yds. rock to
cover dirt fill 506.08
Removal of overhanging rock near Goble Creek
bridge 6,454.32
Widening grade and building fill from Goble
postoffice to Goble Creek bridge 5,853.31
Cutting off rock point to give safe sight
distance around curve 47.12
Removal of slide west of Goble Creek 18.66
Placing 400 feet drain tile in quicksand 137.01
Placing timber foundation for culvert 51.05
--------
Total paid to contractor $ 42,598.42
-----------
Grand total cost $ 46,262.64
Rainier Hill Grading
On July 30, 1917, a contract was entered into with A. L. Clark of
Rainier for the widening of the Rainier Hill Section, a section two and
two-tenths miles in length, located just west of Rainier. This work was
let under a unit price contract, but the nature of the work was such
that a considerable part of it could not be fairly measured and paid for
on a unit, and on this part the contractor was allowed cost plus ten per
cent. The total cost of this improvement was $6,350.61. A detailed cost
statement follows:
DETAILED EXPENDITURE STATEMENT--GRADING--RAINIER HILL SECTION
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account