In April, 1918, the State Highway Department made a reconnaissance
survey over the route from Burns to Vale. All possible routes were
covered in the survey and reported upon fully to the State Highway
Engineer and the Commission. The investigation resulted in the
establishing of the route from Burns direct to Crane and down the
Malheur River through River Side, Juntura, Harper and Vale. This survey
was made by M. O. Bennett, division engineer for the State Highway
Department.
HOOD RIVER COUNTY
Grading--Cascade Locks to Hood River
That section of the Columbia River Highway from the Multnomah County
Line to Hood River passes through the narrowest part of the Columbia
River Gorge through the Cascade Range. The steep river banks rise
directly up from the water's edge for a large part of the distance, so
the space for both railroad and highway is necessarily restricted. At
many points, the right of way of the railroad and highway is contiguous
and construction under these conditions involved extremely heavy work
which added materially to the cost.
[Illustration: THE COLUMBIA RIVER HIGHWAY WEST OF LINDSAY IN HOOD RIVER
COUNTY]
Previous to 1915, there was no road through the County, but from the
proceeds of a bond issue of $75,000, the County built on State standards
a roadway to connect the uncompleted portions. In 1915, the State built
about one mile, including the Mitchell Point Tunnel, one of the many
scenic features of the Columbia River Highway. One mile of pavement
adjoining the Multnomah County pavement was built in 1916 by Mr. S.
Benson.
There remained about fourteen miles which require improvement, and on
August 7, 1917, contracts were awarded to A. D. Kern for grading of
these remaining sections to bring to standard grade and alignment. This
improvement eliminated Ruthton Hill, with its narrow, steep grades,
three railroad crossings, a narrow, steep grade near Wyeth and the
improvement through the village of Cascade Locks to the end of the
pavement. The work was divided as follows: Cascade Locks Section, 8.2
miles; Viento Section, 3.6 miles; Ruthton Hill Section, 4.2 miles. These
contracts were completed in September, 1918. Due to the close proximity
to the railroad tracks, the work required extreme care and watchfulness
but was accomplished without accident and without delays to railroad
traffic. The costs of construction for each of the three sections
follows:
DETAILED EXPENDITURE STATEMENT--GRADING--CASCADE LOCKS SECTION
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account