Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
Engineering $ 8,744.41
Construction--General--
Common Excavation, 60,660 cu. yds. at 42c $25,477.20
Intermediate Excavation, 50,645 cu. yds. at
75c 37,983.75
Solid Rock Excavation, 44,500 cu. yds. at $1.15 51,175.00
Overhaul, per 100 lin. ft., 133,229 cu. yds. at
3c 3,996.87
12-inch Reinforced Concrete Pipe, 1,102 lin.
ft. at $1.75 1,928.50
18-inch Reinforced Concrete Pipe, 140 lin. ft.
at $2.25 315.00
24-inch Reinforced Concrete Pipe, 284 lin. ft.
at $3.00 852.00
30-inch Reinforced Concrete Pipe. 72 lin. ft.
at $4.25 306.00
Class A Concrete, 80.86 cu. yds. at $20.00 1,617.20
Class C Concrete, 32.43 cu. yds. at $14.00 454.02
Placing Reinforcing Steel, 3,197 lbs. at
.00½ 15.99
Catch Basins, 9 at $25.00 225.00
Extra Clearing and Grubbing, 5.79 acres at
$200.00 1,158.00
Extra Clearing, 4.13 acres at $100.00 413.00
Herman Creek Bridge--
Class A Concrete, 137.61 cu. yds.
at $20.00 $2,752.20
Class C Concrete, 3.57 cu. yds.
at $14.00 49.98
Reinforcing Steel (Placing) 23,000
lbs at .00½ 115.00
Reinforcing Steel furnished by State 1,394.32
Removing old bridge and constructing
temporary bridge 426.00
Wet excavation for piers 664.86
Concrete toe wall to protect fill 1,547.98
Railing 438.72
--------
Total cost of Herman Creek Bridge 7,389.06
Gorton Creek Bridge--
Excavation for piers $ 483.44
Class A Concrete, 90.85 cu. yds.
at $20.00 1,817.00
Placing Reinforcing Steel, 7,378
lbs. at .00½ 36.89
Reinforcing Steel furnished by State 447.27
Railing 224.29
Rip-rap 145.01
--------
Total cost of Gorton Creek Bridge 3,153.90
Force Account Work as Follows--
Construction and Removal of temporary bridge
over Dry Creek 15.78
Removing Slide from O.-W. R. R. & N. Tracks 95.59
Gravel Surfacing--End of Pavement to Cascade
Locks 2,418.55
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account