Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
===============+==========+==========+===========+==========+===========
| 1915 | 1916 | 1917 | 1918 | Totals
---------------+----------+----------+-----------+----------+-----------
Regrade and | ... |$35,330.82| $16,444.10| ... | $51,774.92
Macadam | | | | |
Hard Surface |$80,944.11| 4,111.79| 200,047.81| 41,393.37| 326,497.08
Shoulders | ... | 5,081.80| ... | ... | 5,031.80
Drainage | ... | ... | 5,022.19| ... | 5,022.19
Bridges | ... | 28,591.39| 14,203.21| ... | 42,794.60
Right of Way | ... | ... | 2,538.06| ... | 2,538.06
and Miscel- | | | | |
laneous | | | | |
Engineering, | 3,500.00| 3,400.00| 16,667.87| 2,000.00| 25,567.87
Superinten- | | | | |
dence and | | | | |
Overhead | | | | |
+----------+----------+-----------+----------+-----------
Total |$84,444.11|$76,465.80|$254,933.24|$43,393.37|$459,226.52
---------------+----------+----------+-----------+----------+-----------
SUMMARY
Pavement $326,497.08
Bridges 42,794.60
Grading 64,366.97
Engineering and Overhead 25,567.87
-----------
Grand Total $459,226.52
POLK COUNTY
The work of the State Highway Department in Polk County during 1917 and
1918 has been confined chiefly to the design and the supervision of
construction of bridges. In addition to the design and supervision of
the Salem Bridge which is partly within Polk County, and which is
described in detail in an article in the chapter devoted to Marion
County, the Department has handled, at the request of the Polk County
Court, the following bridge work, all of which has been paid for by the
County.
Between Monmouth and Dallas a 37 foot reinforced concrete bridge was
built over a slough on the Mulkey Cut-off. This bridge complete cost
$1,898.17.
The Hollingshead Bridge over the Little Luckiamute River south of Dallas
is a 72 foot covered wooden span on concrete piers. This bridge was
built at a cost of $3,615.00.
A 160 foot suspension foot-bridge was built over the Big Luckiamute
River at a cost of $500.00, to accommodate school children attending the
Montgomery School.
The LaCreole Creek Bridge in Dallas is a reinforced concrete arch
structure seventy feet long. This bridge was not designed by the Highway
Department, but the Department supervised its construction. It is a very
pretty structure with sidewalks and lighting fixtures. It was built at a
cost of $10,755.68.
SHERMAN COUNTY
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account