Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
The grading in Washington County will cost complete approximately
$39,699.85 of which Washington County has paid $9,395.00. The part of
the paving within Washington County will cost complete $234,750.00 all
of which is paid for from State Funds.
DETAILED STATEMENT OF EXPENDITURES TO NOVEMBER 30, 1918 GRADING AND
PAVING MULTNOMAH COUNTY LINE TO NEWBERG
Engineering $ 9,445.56
Right-of-Way Costs 49.98
Construction:
Crushed Stone Shoulders, 163,663.4 lin. ft.
@ .06 $ 9,819.80
Standard Bitulithic Pavement, 149,764.4 Sq.
Yds. @ $1.28 191,698.43
Broken Stone, Loose Measure, 34,885.75 Cu.
Yds. at $2.40 83,725.80
Clearing and Grubbing 1,250.00
Common Excavation, 46,773.9 Cu. Yds. @ .34 15,903.13
Intermediate Excavation, 9,224.4 Cu. Yds. @ .62 5,719.13
Solid Rock Excavation, 385 Cu. Yds. @ $1.15 442.75
Overhaul per 100 Lin. Ft., 172,279.2 Cu. Yds.
@ .01 1,722.79
12-inch Reinf. Conc. Pipe, 1,568 Lin. Ft.
@ $1.25 1,960.00
24-inch Reinf. Conc. Pipe, 52 Lin. Ft. @ $2.45 127.40
36-inch Reinf. Conc. Pipe, 96 Lin. Ft. @ $4.25 408.00
6-inch Porous Drain Tile, 7,191 Lin. Ft. @ .15 1,078.65
Rip-Rap, 32 Cu. Yds @ $2.75 88.00
Force Account:
Lowering and lengthening existing culverts 1,081.67
Replacing bridge approach at Tualatin River 50.27
Special wide ditches alongside road near Four
Corners 814.50
Back-fill and planking at Onion Flat Trestle 405.94
Tearing down old trestles at Onion Flat 55.33
Replacing private water supply crossing 13.31
Rebuilding Right of Way Fences 70.85
Grading at Middleton R. R. Crossing 1,970.47
Blind Drains 189.68
New 30-foot Culvert 223.60
New 42-foot Culvert and special fill over it 468.26
Drain Tiling, back-filled with rock 582.09
-----------
Total amount earned by Contractor to Nov.
30, 1918 $319,869.85
Less amount retained pending completion of
contract 50,388.46
-----------
Total paid contractor to November 30, 1918 269,481.39
-----------
Total expended to November 30, 1918 $278,976.93
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account