Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
One hundred and twelve miles of State roads have been surfaced with
broken stone and gravel macadam. Practically all of this surfacing is
sixteen feet wide; there are, however, a few short stretches of
nine-foot width necessitated by the coming on of wet weather before the
full sixteen-foot width could be completed. The total quantity of broken
stone and gravel placed in these 112 miles of surface was 247,925 cubic
yards, an average of 2,210 cubic yards per mile, which quantity of
material per mile gives an average loose thickness of eight and one-half
inches for macadam sixteen feet wide. The Department's specifications
call for a minimum thickness of six inches. In many places, however,
particularly on the lower Columbia River work it was found necessary to
place as much as eighteen and twenty-four inches of rock before a
satisfactory foundation could be secured.
The sections upon which broken stone or gravel surfacing was placed are
as follows:
Clatsop County-- Miles
Astoria to Columbia County Line 24.4
Columbia County--
Clatsop County Line to Goble 27.2
Deschutes County--
Bend-Lapine Section (cinder macadam) 12.5
Douglas County--
Divide to Leona 7.0
Gilliam County--
Condon to Thirty Mile Creek 6.7
Hood River County--
Cascade Locks to Hood River 18.0
Jackson County--
Siskiyou Mountain Section 6.5
Lake County--
Lakeview-Paisley Section 4.0
Lane County--
Divide-Cottage Grove Section 1.0
Wheeler County--
Cummins Hill Section 4.5
-----
Total miles of macadam surfacing 111.8
A complete description of each of the above sections will be found in
the chapter devoted to the county in which the work was performed.
GRADING
The grading work of the Highway Department is confined to the building
of those sections of State roads which are so located that the counties
in which they occur are not directly interested in their construction or
which are so expensive that county funds are inadequate for their
construction. The total number of miles graded during the last two-year
period was 134.5 miles, most of which was on the Pacific and Columbia
River highways.
While the grading work was greatly curtailed during 1918 on account of
war conditions, work was continued in those localities where resident
labor was available and where the work interfered in no way with more
essential war industries.
A complete tabulation of the grading jobs is given elsewhere in this
report, and a detailed outline of each is given under the respective
county headings. A few of the more important grading jobs are as
follows:
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account