Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918 — John Shaqi
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918Benson, Simon
History
Third biennial report of the Oregon State Highway Commission : $b covering the period December 1st, 1916 to November 30th, 1918
Benson, Simon
Highway engineering -- Oregon -- History; Water resources development -- Systems engineering -- Oregon -- History
To determine the legality of the State and Federal co-operative bonds
for co-operation on post and forest roads, a friendly suit was brought
in the Supreme Court which was decided favorable to the issue.
The interpretation placed on the Federal Aid Road Law by the Secretary
of Agriculture requiring actual carriage of the mails or a reasonable
prospect before approving as eligible for Federal co-operation
eliminated from the classification practically all of the Columbia River
Highway and especially links in the Pacific Highway in Douglas county on
which it was desired to receive Federal aid.
Under the post road law seventeen projects have been agreed upon, and to
date ten have been approved, three disapproved, two pending and two in
preparation. Construction work has been started on two of these
projects. Under the forest road law fourteen projects have been
approved. Construction has been started on four of these projects.
Several will carry over into the 1920 program.
A railroad asphalt paving plant was purchased but not used during the
1918 season, since no bituminous pavements were constructed, under new
contracts, in that period. Three concrete pavers are owned by the
Commission, as well as three road rollers, four rock crushers, and six
auto trucks, besides considerable grading construction equipment. A
large part of this equipment has been in use this season and not only
has saved the cost of rented equipment but has been available at times
when it was impossible to get the same elsewhere.
A total of seventy-one projects have been advertised as follows. It will
be noted that the number of proposals exceeds the number of bidders
which may be explained by the fact that on paving work bidders have made
proposals on more than one type of pavement.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account