Three little lines : $b Silverton Railroad, Silverton, Gladstone & Northerly, Silverton NorthernCrum, Josie Moore
History
Three little lines : $b Silverton Railroad, Silverton, Gladstone & Northerly, Silverton Northern
Crum, Josie Moore
Railroads -- Colorado -- San Juan County
The first necessity, of course, was a locomotive. So the company
purchased the D. & R. G.’s No. 42, a Baldwin of 30 tons, called 60
class. It was overhauled and given the number “100” and the name
“Ouray”. The number may be seen on the old-fashioned kerosene headlight
in a picture herein.
The 5.3 miles of railroad from Silverton to Burro Bridge must have been
constructed in the summer of 1887 for it is known to have been in
operation by the first of June of the next year. In 1888 Charles W.
Gibbs, who had served under Mr. Wigglesworth on a number of projects,
became the locating and construction engineer. He started late in May at
Burro Bridge and in early November had completed 11.2 miles through Red
Mountain and to Ironton. Only 11.2 miles in over five months! But anyone
acquainted with the country is not surprised.
Spurs then or later were laid to the Yankee Girl, Vanderbilt, North
Star, Silver Bell, Guston and Treasury Tunnel. The map here included was
made by Mr. Gibbs and appeared in a September 1890 Bulletin of the
American Society of Civil Engineers. Mr. Gibbs built the 1.5 miles from
Ironton to Albany in 1889.[1] Albany was the Saratoga mill which stood
against the east hill of Ironton Park. His report notes 5% grades, 30°
curves, 3-foot gauge and 30-lb. rail. No reliable figures for the cost
of construction are available but ordinarily a railroad of that kind at
that time ate up about $25,000 to the mile.
In 1888 Mr. Gibbs was writing love letters to Miss Adeline Hammon of
Colorado Springs and the next year they were married. She has kept his
letters all these years from which these excerpts, dealing with the
construction of the railroad from Burro Bridge to Ironton, are taken.
“Chattanooga, June 10, 1888. Arrived here bag and baggage about three
weeks ago and have my headquarters 10,200 feet above sea level and my
next camp will be still higher, about 11,000 feet. More than 100 Mexican
workers camped nearby.”
“Gustine Mine, July 22, 1888. I am occupying the house of a former mine
superintendent and have many conveniences not found in a railroad camp.
Went to Silverton on the passenger train last night and returned this
morning. Regular trains are running to where my first camp was
(Chattanooga) and in a month’s time will be here and maybe they will get
track laid before that as the grading will be done in two weeks time.
About 400 Mexicans working.”
“Gustine Mine, August 11, 1888. Work is getting along splendidly and
during this week I will get surveys made to Ironton which is as far as
the line will be built this year. By the middle of next week the work
will be only two miles from here and in a very short time at my door.”
“Gustine Mine, September 16, 1888. Construction work will be done in
about five weeks; then I shall go to Telluride to make a short survey
for a three foot gauge road.” (This became the Rio Grande Southern.)
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account