Shipwrecks -- North Atlantic Ocean -- History; Titanic (Steamship)
The method of opening and closing them was one of the many marvels of
modern engineering. The heavy steel doors were held up above the
openings by a series of friction clutches. Up on the bridge were
switches connected with powerful electro-magnets at the side of the
bulkhead openings. The operation of the switches caused each magnet to
draw down a heavy weight which instantly released the friction clutches,
so that the doors would slide down in a second or two into their places,
a gong ringing at the same time to warn anyone who might be passing
through to get out of the way. The clutches could also be released by
hand. But if for any reason the electric machinery should fail, there
was a provision made for closing them automatically in case the ship
should be flooded with water. Down in the double bottom of the ship were
arranged a series of floats connected with each set of bulkhead doors.
In the event of water reaching the compartment below the doors, it would
raise the floats, which, in their turn, would release the clutches and
drop the doors. These great bulkheads were no new experiment; they had
been tried and proved. When the White Star liner _Suevic_ was wrecked a
few years ago off the Lizard, it was decided to divide the part of her
which was floating from the part which was embedded in the rocks; and
she was cut in two just forward of the main collision bulkhead, and the
larger half of her towed into port with no other protection from the sea
than this vast steel wall which, nevertheless, easily kept her afloat.
And numberless other ships have owed their lives to the resisting power
of these steel bulkheads and the quick operation of the sliding doors.
As for the enormous weight that made for the _Titanic’s_ stability, it
was, as I have said, contained chiefly in the boilers, machinery and
coal. The coal bunkers were like a lining running round the boilers, not
only at the sides of the ship, but also across her whole breadth, thus
increasing the solidity of the steel bulkheads; and when it is
remembered that her steam was supplied by twenty-nine boilers, each of
them the size of a large room, and fired by a hundred and fifty-nine
furnaces, the enormous weight of this part of the ship may be dimly
realized.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account