Torpedoes and Torpedo Warfare: Containing a Complete and Concise Account of the Rise and Progress of Submarine WarfareSleeman, Charles William
History
Torpedoes and Torpedo Warfare: Containing a Complete and Concise Account of the Rise and Progress of Submarine Warfare
Sleeman, Charles William
Torpedoes
The signal battery current is always circulating, even when the system
is in a state of rest, but in consequence of the resistance placed in
this circuit, which may be either a resistance coil in the circuit,
added to the resistance of the fuzes, when high tension fuzes are used,
or only the former resistance in the case of low tension fuzes, this
current is too feeble to form an electro magnet; directly, however,
a circuit closer is struck, this resistance is cut out, and thus the
signal battery current becomes sufficiently powerful to work the
electro magnet of that particular mine.
The circuit of the signal battery, and that to the observing telescope,
are broken the instant the lever commences to fall.
To enable the apparatus to be used on the circuit breaking system, a
spare lever _E_ is provided for that purpose with each box.
The object to be gained by a system of testing is to ascertain the
condition of the electrical submarine mines placed in the defence of
a harbour, &c., and should there exist any fault, not only to detect
its exact position and cause, but also its magnitude, so that it may
be at once determined whether it is necessary to remedy the fault, or
whether the electrical apparatus is sufficiently powerful to overcome
the defect.
_Tests._--There are two distinct kinds of tests, viz.:--
1.--Mechanical tests.
2.--Electrical tests.
[Illustration: SHUTTER APPARATUS.
PLATE XXI]
Mechanical tests are applied to ascertain that the mechanical
arrangements of the shutter apparatus, circuit closers, and all similar
appliances work efficiently and easily; that the several parts of the
mine case when put together for service are thoroughly watertight;
that the chains, wire cables, and ropes in connection with the mooring
apparatus are of sufficient strength to perform the work required of
them; that the weights of the anchors, or sinkers, are such as to keep
the mines in position after submersion; and that the case of the mine
be sufficiently strong to enable it to bear the external pressure due
to the depth at which it may be submerged for a considerable time
without any leakage.
The foregoing tests of the mine case and moorings would of course be
performed during the process of manufacture, but to prevent any chance
of failure they should be repeated before being employed on actual
service.
_Electrical Tests._--Electrical tests are those which are applied
to the several component parts of the system, to ascertain that the
electrical conditions necessary to a successful result exist.
The importance of being able to carry out the above in its entirety
is understood when it is remembered that a submarine mine becomes
practically valueless unless it acts efficiently at the single instant
of time that it would be required so to do.
_List of Instruments used in Testing._--The following are some of the
instruments that are employed in connection with a system of electrical
tests:--
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account