Vigorous action had to be taken to permit of satisfactory service.
This work has been energetically carried on with gratifying results
insofar as economy, regularity and safety of transportation are
concerned. Unfortunately, prices and scarcity of labor and material
continued to increase until the latter part of 1920, with the result
that the cost of performing this absolutely necessary work was
abnormally high during the first two years.
RAILS:--Most of the main line east of Winnipeg was laid with 80 or
85lb. rails, but many miles of main lines were still laid with rails
on branch lines had to be replaced, on account of wear, and their
inability to carry heavy cars.
Parts of the main lines west of Winnipeg were already laid with 80 or
85lb. rail, but many miles of main lines were still laid with 60lb.
rails which, on the more important traffic sections were replaced by
85lb. rails, and the lighter steel thus released was used on branch
lines under construction.
The installation of heavier new rails does not necessarily imply the
scrapping of the rails that are taken up. They are generally used
over and over again. In this way a large mileage previously laid with
light rails has been equipped with 80 or 85lb. sections.
The statement of new rails purchased for application during the years
1919, 1920, 1921 and ordered for 1922, follows:--
Year Tons Miles
1919 92,703 692.0
1920 67,238 532.0
1921 79,754 559.0
1922 (on order) 51,000 360.0
TIES:--The general condition of ties on the older lines, due to
deferred maintenance during the war necessitated an abnormally high
percentage of renewals. On the Eastern branch lines very large
numbers of ties had to be installed immediately, to maintain traffic
with reasonable safety.
The situation was markedly aggravated because of a very large mileage
constructed between 1910 and 1914 on which the original ties had to
be largely replaced, the average life of untreated softwood ties
being approximately eight years.
The condition of ties on these lines of late construction is now
approaching normal, and on the older lines is satisfactory.
The new ties laid for maintenance and not for new construction, are
as follows:--
Year Number Average Cost
1919 7,203,532 .73c
1920 7,245,035 .81c
1921 5,898,374 .85c
1922 (ordered) 4,500,000 .57c
(to be applied) 5,500,000
BALLASTING:--A great deal of the mileage was insufficiently
ballasted. Speed of trains was restricted, riding qualities were
wholly unsatisfactory, and the expense of constantly restoring track
to passable surface and alignment was unnecessarily high.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account