Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur HawkesHanna, D. B. (David Blyth)
History
Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur Hawkes
Hanna, D. B. (David Blyth)
Canadian National Railways; Railroads -- Canada; Railroads -- Scotland
Some of the more recently constructed main lines were fairly well
ballasted when built, but a good deal of the ballast was, as is
usual, absorbed in the embankment before it solidified. As the dump
settled it left many sags and irregularities in the track. It was
imperative to apply a very considerable amount of ballast in excess
of what might be considered normal for older track. Most of this
extra work has been performed. This experience in connection with new
lines is common. Track is not usually considered to be stable until
it has been ballasted three times. The use of heavier locomotives
and cars, to secure economical operation, also necessitated heavier
ballasting on certain sections.
The improvement in track conditions has been most marked, and we are
now enjoying better riding, greater track stability, and less cost of
maintenance.
BRIDGES, TRESTLES AND CULVERTS:--Prior to the period under review,
the Intercolonial main line bridges had generally been replaced by
heavier structures to carry larger and more powerful locomotives.
But construction of double track at certain points necessitated new
double track bridges, the most expensive one being over the Tantramar
River in New Brunswick.
The situation on the branch lines, including the Halifax and
Southwestern Railway was very unsatisfactory. The steel bridges were
generally of insufficient strength to safely carry the heavy cars
coming into general use on all roads. The wooden structures required
complete replacement or very extensive repairs. While a considerable
number on those branch lines require attention in the near future,
most of them have been dealt with.
The National Transcontinental bridges were generally of a high
standard, but some pile trestles, particularly at points where the
foundations were uncertain, have been replaced.
On the Canadian Northern Quebec lines the bridge situation was
very serious. Bridges are very numerous. The large steel ones were
generally too light for heavy locomotives. Replacement of the timber
structures was imperative. Traffic from the paper and pulp industry
had so rapidly increased, that it could not well be handled with the
comparatively small locomotives that could use the bridges. It was
expedient to reduce the loads of large capacity cars, or to place
lighter cars between them to ensure safety. Besides the inability to
handle satisfactorily all of the traffic offered, the use of so many
train units was extremely wasteful. There was no alternative but to
replace most of the bridges.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account