This work was undertaken in the spring of 1918, to make the main
line between Ottawa and Quebec, between Montreal and Joliette;
between Garneau and Riviere au Pierre; and between Quebec and
Chicoutimi; suitable for Mikado locomotives, with a tractive effort
of 53,000 lbs. compared with those of 25,000 and 30,000 lbs. formerly
available. With a very large increase in the tonnage and decrease in
the number of trains, the economies in operation are very great.
On the Canadian Northern main lines between Ottawa and Port Arthur,
and Toronto and Capreol, while steel bridges of high classification
were provided over the principal streams many ravines were crossed
by timber trestles, the intention being to fill them with earth when
the lifetime of the original timber had expired and provide steel or
concrete structures over the streams.
There were eighteen miles of timber trestles on these lines in
Ontario. To date about one-half of this mileage has been disposed of.
The same policy in respect to timber trestles was followed on the
Canadian Northern and Grand Trunk Pacific Railways in the West.
There are many large timber structures on the Grand Trunk Pacific
between Winnipeg and Prince Rupert, and also on the Canadian Northern
between Warden and Brazeau in Alberta. Again, on the line between
Wayne and Calgary there are many comparatively small trestles but
about one-third of them have been replaced. There are also quite a
number of timber structures on the Canadian Northern between Edmonton
and Vancouver, but most of them are small. All large openings are
crossed by heavy steel bridges.
STATIONS AND OTHER BUILDINGS:--The only large stations that have been
constructed are terminal buildings at Levis, Capreol, Hornepayne and
Rainy River. Ordinary stations have been erected at intermediate
points either to replace ones destroyed by fire, or under order of
the Board of Railway Commissioners to meet the demands of increased
traffic.
The roof of the train shed at St. John collapsed in 1919 as a result
of age and corrosions, and was entirely removed, temporary wooden
umbrella shelters over platforms being substituted. The station
building itself has also suffered to some extent, apparently through
the settlement of foundations. Plans have been prepared for a new
station of different type, suitable to the peculiar topographical
conditions, but as grade separation and the cutting down of grades
are involved, an agreement with the City is necessary before any work
can be undertaken.
Numerous enlargements of freight sheds and express buildings have
also been made, to provide for growing traffic.
Owing to labor shortage, it was exceedingly difficult to maintain
section forces, largely on account of lack of living accommodation at
isolated points. It was found necessary to build section houses each
year. This policy will necessarily have to be continued for several
years before the lines are completely equipped.
Public-domain text, read in full here on John Shaqi.
Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur Hawkes — John Shaqi
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account