Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur HawkesHanna, D. B. (David Blyth)
History
Trains of Recollection: Drawn from Fifty Years of Railway Service in Scotland and Canada, and told to Arthur Hawkes
Hanna, D. B. (David Blyth)
Canadian National Railways; Railroads -- Canada; Railroads -- Scotland
The only way to get construction material to Winnipeg and the West
in time for the spring opening was from the south. Van Horne bought
rails in England and Germany, had them shipped to New Orleans, and
hauled in trainloads up the Mississippi Valley. He made a contract
with a St. Paul firm for the grading, up to the point of actually
laying ties and steel, from Oak Lake, west of Brandon, to Calgary.
The day after the contract was signed they advertised for three
thousand men and four thousand horses.
Van Horne organized his own gangs of tracklayers and kept them
right on the heels of the graders. There was delay in starting
work, because the Red River Valley above Winnipeg was abnormally
flooded. Then the contractors didn’t work fast enough. On threat of
cancelling the whole thing Van Horne speeded up the construction.
Working furiously into the freeze-up, finished only 417 miles on the
prairie section. But the work done elsewhere did complete over five
hundred miles of construction that year; and it was plain that the
new driving force would get even greater results another season.
The next year saw steel laid right to Calgary and immense progress
made between Lake Nipissing and Thunder Bay. This piece of work
caused J. J. Hill to drop out of the C.P.R., and to become a business
enemy of Van Horne’s. Hill, an Ontario farm boy, had induced Donald
Smith (afterwards Lord Strathcona) and his cousin George Stephen
(Lord Mountstephen) to join him in getting hold of a Minnesota
railroad that had been financed by Dutch bondholders. This road
developed into the Great Northern, out of which Smith and Stephen
made, it has been stated, more money than they did out of the C.P.R.
These associates created the syndicate which obtained the C.P.R.
charter, and began construction. Things were dragging, and it
seemed likely that the ten years stipulated for with the Canadian
Government would be needed to complete the road to the Coast, when
Hill recommended that Van Horne be made general manager, with large
powers. The appointment was made, but before long, Hill and Van Horne
clashed, as strong men often do.
When Van Horne took hold, a railway was under construction from
Callender (just east of North Bay) to Sault Ste. Marie, where it
was to tie in with the Hill road and its Winnipeg connections. The
line from Port Arthur to Winnipeg was well advanced; and the utmost
use was to be made of the possibilities of lakes navigation for
communications with Eastern Canada under all-Canadian auspices. But
it was figured that the line around Superior would be too costly and
too unremunerative an undertaking for many years. All the traffic
during non-navigation months would go over the Hill line--and that
was one of several reasons for Hill’s going into the C.P.R.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account