Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910: The New York Tunnel Extension of the Pennsylvania Railroad,; The North River Division. Paper No. 1151Jacobs, Charles M. (Charles Mattathias)
History
Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910: The New York Tunnel Extension of the Pennsylvania Railroad,; The North River Division. Paper No. 1151
Jacobs, Charles M. (Charles Mattathias)
Civil engineering -- Periodicals; Railroad tunnels -- Design and construction
At this time a commission had been appointed by the Legislature to
investigate the conditions on Atlantic Avenue, Brooklyn, and evolve some
scheme for the elimination of grade crossings on that avenue. Early in
1896 plans were prepared and presented to this Commission; first, for a
subway from Flatbush Avenue Terminal for the entire distance to the
limits of the City of Brooklyn at Eldert's Lane; second, for a subway
from the Flatbush Avenue Terminal to East New York, Manhattan Crossing,
the railroad to remain as it previously existed at grade through the
26th Ward of Brooklyn. Each of these schemes contemplated an extension
through Brooklyn to New York City at Cortlandt Street and Broadway, and
surveys and borings for this work were made across the East River. In
the summer of 1896, on the decease of Mr. Corbin, all projects and work
were immediately stopped; but, after some months, Mr. W. H. Baldwin,
Jr., when elected President of the Long Island Railroad Company, took up
actively the reconsideration of the means whereby the Long Island
Railroad could reach New York City. After the fullest consideration, he
decided that the Blackwell's Island Bridge was by no means a suitable,
adequate, or convenient entry for the Long Island Railroad into New York
City, as it involved too great a cost and altogether too rigid a
connection; it was also a very inconvenient location, inasmuch as it was
cut off from convenient access to the west side of New York City by
Central Park.
For the down-town connection, Mr. Baldwin became enthusiastic, but he
had in mind, throughout, the all-important necessity for the Long Island
Railroad to reach the Pennsylvania Railroad across the North River. At
the same time Mr. Baldwin took up energetically the Atlantic Avenue
Improvement with the Atlantic Avenue Commission, and, on consideration,
decided it was essential that it should extend through the 26th Ward
above or below grade. The better plan, of course, was obviously to make
it a subway throughout, but, further, the residents of this ward
objected to the subway through that section, and that construction would
have made any change of the Manhattan Beach Division at Manhattan
Crossing very difficult for the future; besides this, the controlling
factor was the absolute limitation by the City of Brooklyn of the amount
of expenditure therefor in which they would participate, therefore a
composite scheme, which is the plan as carried out, was agreed upon,
being in part subway and part elevated. This scheme reached a focus
early in 1897, and the law constituting the Board for the Atlantic
Avenue Improvement was passed, with a provision in the last paragraph of
the Act, for the construction of a tunnel from Flatbush Avenue Terminal
under Flatbush Avenue and Fulton Street to Pineapple Street, crossing
the river to Broadway and Maiden Lane (Cortlandt Street), New York City,
and with the understanding that it would be extended beyond the New York
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account