The character of the trap rock varied considerably. At the contact,
at Station 275, and for a distance of approximately 200 ft. west,
corresponding to a thickness of about 60 ft. measured at right angles to
the line of the contact, a very hard, fine-grained trap, almost black in
color, was found, having a specific gravity of 2.98, and weighing 186
lb. per cu. ft. The hardness of this rock is attested by the fact that
the average time required to drill a 10-ft. hole in the heading, with a
No. 34 slugger drill, with air at 90 lb. pressure, was almost 10 hours.
The specific gravity of this rock is not as high as that of some other
specimens of trap tested, which were much more easily drilled. This rock
was very blocky, causing the drills to bind and stick badly, and, when
being shoveled back from the heading, as it fell it sounded very much as
though it were broken glass.
The remainder of the trap varied from this, through several changes of
texture and color, due to different amounts of quartz and feldspar, to a
very coarse-grained rock, closely resembling granite of a light color,
though quite hard. The speed of drilling the normal trap in the heading
was approximately 20 to 25 min. per ft., as compared with the 60 min.
per ft. noted above, the larger amounts of quartz and feldspar
accounting for the greater brittleness and consequently the easier
drilling qualities of the rock. The normal trap in these tunnels has a
specific gravity varying from 2.85 to 3.04, and weighs from 179 to 190
lb. per cu. ft.
The temperature of the tunnels, at points 1,000 ft. from the portals at
both ends, remained nearly stationary, and approximately between 50° in
winter and 60° in summer, up to the time the headings were holed
through, being practically unaffected by daily changes in the
temperature outside. At the western end, after the connection with the
Central Shaft headings was made, there was almost always a current of
air from the portal to the shaft, and ascending through the latter. This
tended to make the temperature in this part of the tunnel correspond
more nearly with the outside temperature; in fact, the variation was
seldom more than 5° Fahr.
_Timbering._--These tunnels have been excavated entirely by the center
top heading method, almost invariably used in the United States.
Timbering, where required, was of the usual segmental form with outside
lagging, as shown in several of the photographs. In a few places it was
necessary to hold the ground as the work progressed, and, in such cases,
crown bars were used in the headings.
There was some little trouble at the Western Portal, where the top of
the rock was very near the roof of the tunnel, as shown by Fig. 1, Plate
XXI. A side heading was driven at the level of the springing line until
a point was reached where the roof was self-supporting, and the
timbering was brought out to the face of the portal from that point.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account