The concrete for the foundations was hauled in steel, =V=-shaped,
dumping cars holding about 1 cu. yd., and the concrete for the
bench-walls and arches in Stuebner, 1-yd., bottom-dumping buckets placed
on small flat cars, as shown by Fig. 1, Plate XXIV. Rock packing was
handled in Allison 4-yd. cars and also in the cars shown by Fig. 5,
as well as in the Stuebner buckets, the latter, however, being most
generally used. Mules were used for a short time at the Weehawken end to
haul the concrete in, but proved entirely inadequate to haul the loaded
cars up the 1.3% grade, and locomotives were substituted after the
headings were holed through. At the western end the cars were allowed to
coast in, and, up to the time the headings were holed through, were
hauled back by mules; after that they were pushed out by a locomotive
which had gone in ahead of them. As a rule, from 8 to 10 cars of
concrete and rock packing were sent in, one after the other, in proper
order, a boy riding on each car and stopping it at the proper place; all
these cars were pushed out together when empty.
[Illustration: Plate XXIV.
Fig. 1: K 131. P.R.R. Tunnels, N. R. Div. Sect. K. (Bergen Hill
Tunnels) Weehawken Shaft, North Tunnel. Rear view of conveyor for
concrete, showing method of hoisting bucket from car on track in
hopper over belt. June 7, 07.
Fig. 2: K 130. P.R.R. Tunnels, N. R. Div. Sect. K. (Bergen Hill
Tunnels) Weehawken Shaft, South Tunnel. View showing waterproofing
(extreme left) portion of completed sand wall, sand wall forms,
traveller and end of conveyor overhead. July 22, 07.
Fig. 3: K 148. P.R.R. Tunnels, N. R. Div. Sect. K. (Bergen Hill
Tunnels) Weehawken. View showing method of placing concrete in
forms. Hoisting apparatus and bucket in background. Sept. 24, 07.
Fig. 4: K 154. P.R.R. Tunnels, N. R. Div. Sect. K. (Bergen Hill
Tunnels) Weehawken Shaft, North Tunnel. Method of placing concrete
in bench walls. Top of waterproofing suspended from top of sandwall.
Oct. 21, 07.]
During the time the excavation was being carried on simultaneously with
the lining at the Weehawken end, the rock packing was loaded at the
working face and sent out to the point where it was to be used; after
that the rock packing was sent in from outside from the reserve pile on
the north side of Baldwin Avenue.
At the western end the larger part of the rock packing was sent in from
outside, but occasionally, during the time the excavation was going on,
the cars from the heading were stopped at convenient points, generally
under the gantries, where the lining was being placed, and whatever
stone could be utilized was sorted from the top and passed up to the
platforms above.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account