Transactions of the American Society of Civil Engineers, Vol. LXX, Dec. 1910: A Concrete Water Tower, Paper No. 1173Kempkey, A.
History
Transactions of the American Society of Civil Engineers, Vol. LXX, Dec. 1910: A Concrete Water Tower, Paper No. 1173
Kempkey, A.
Civil engineering -- Periodicals; Water towers -- Design and construction
The tower is built on out-cropping, solid rock. This rock was roughly
stepped, and a concrete sub-base built. This sub-base consists of a
hollow ring, with an inside diameter of 20 ft., the walls being 5 ft.
thick. It is about 2 ft. high on one side and 7 ft. high on the other,
and forms a level base on which the tower is built. The forms for this
sub-base consist of vertical lagging and circumferential ribs. The
lagging is of double-dressed, 2 by 3-in. segments, and the ribs are of 2
by 12-in. segments, 6 ft. long, lapping past one another and securely
spiked together to form complete or partial circles. These ribs are 2
ft. from center to center.
[Illustration: FIG. 1.--(Full page image)
WATER TOWER VICTORIA, B.C. WATER-WORKS]
Similar construction was used to form the taper base of the tower
proper, except, of course, that the radii of the segments forming the
successive ribs decreased with the height of the rib. Tapered lagging
was used, being made by double dressing 2 by 6-in. pieces to 1-3/4 by
5-13/16 in., and ripping on a diagonal, thus making two staves, 3 in.
wide at one end and 2-3/4 in. wide at the other. This tapered lagging
was used again on the 4-ft. belt and cornice forms, the taper being
turned alternately up and down.
[Illustration: FIG. 2.--FORMS FOR WATER TOWER VICTORIA, B.C.]
The interior diameter being uniform up to the bottom of the dome,
collapsible forms were used from the beginning. These forms were
constructed in six large sections, 6 ft. high, with one small key
section with wedge piece to facilitate stripping, as shown in Fig. 2.
There were three tiers of these, bolted end to end horizontally and to
each other vertically.
Above the taper base and except in the 4-ft. belt and cornice,
collapsible forms were used on the outside also. There were six sections
extending from column to column and six column sections, all bolted
together circumferentially and constructed as shown in Fig. 2. Three
tiers of these were also bolted together both vertically and
horizontally.
Having filled the top tier, the mode of operation was as follows:
All horizontal bolts in the lower inside and outside forms were removed,
as was also the small key section on the inside; this left each section
suspended to the corresponding one immediately above it by the vertical
bolts before mentioned. It is thus seen that in each case the center
tier performed the double duty of holding the upper tier, which was full
of green concrete, and the sections of the lower tier, until they were
hoisted up and again placed in position to be filled.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account