Tube, Train, Tram, and Car; or, Up-to-date locomotionBeavan, Arthur H. (Arthur Henry)
History
Tube, Train, Tram, and Car; or, Up-to-date locomotion
Beavan, Arthur H. (Arthur Henry)
Electric automobiles; Electric railroads; Street-railroads -- England -- London
However, this unsatisfactory means of communication was hardly likely to
escape the notice of such astute experts as Mr. J. C. Mott, doyen
director of the Great Western Railway, and his far-seeing friends. They
took counsel together, and, after the usual hard task of _persuading_
people, plans were matured, and in 1884 an enterprise was organised and
incorporated as the City of London and Southwark Subway Company, to
construct a line of railway from King William Street to the “Elephant
and Castle,” with an intermediate station at Marshalsea Road.
This was the initial stage of the present well-known railway.
At the outset, three points had to be considered. How was the subway to
be constructed? What motive power should be employed? And how was the
deep level to be reached by the passengers? A subway under the Thames
was no novelty. The directors of the new line were not the “first that
ever burst into that silent sea” of mud and gravel at the bottom of the
swift-flowing river. Brunel had been long before them with his costly
Thames Tunnel, and Barlow had years ago laid upon its oozy bed the Tower
Subway of iron.
It was decided that a tube, or, rather, two independent tunnels of
cast-iron rings, should be driven side by side beneath the bottom of the
stream, a little to the west of London Bridge, and continued on the
Surrey side.
On this system the work was begun by the contractors, Siemens Brothers
and Mather and Platt, and proceeded with quite out of public sight. It
was accompanied with many disheartening delays and seemingly
insurmountable difficulties; but they were all successfully overcome,
and the tubes were brought to a temporary end at the “Swan,” Stockwell,
to which charming retreat, by an Act of Parliament, 1887, an extension
of the line had been sanctioned, making its length a little over three
miles.
The motive power eventually selected was electricity, steam being
impracticable, and the funicular or cable system considered unreliable.
Access to and from the trains was to be obtained at the stations by
means of capacious twin-lifts capable of holding many people at a time.
Then the problem of how best to utilise the ample “power,” generated at
the Stockwell Station, for hauling the cars, had to be seriously
tackled. It was not a question of a toy line like that on the Brighton
beach, but of the driving at fair speed, say 15 miles an hour, of
comparatively heavy coaches laden with passengers, and at frequent
intervals. Altogether it was a new departure in electric traction.
How the motor locomotives were effectually to pick up the current was
the puzzle which had to be solved, or the enterprise might at the last
moment collapse and the subscribed capital be lost.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account