The progress was piecemeal. In operation the miners would remove one
breasting board at a time, excavate in front of it, and then replace
it in the advanced position--about 6 inches forward. This was repeated
with the next board above or below, and the sequence continued until
the ground for the entire height of one of the 12 sections had been
removed. The board screws for that section were shifted to bear on the
adjacent frames, relieving the frame of longitudinal pressure. It
could then be screwed forward by the amount of advance, the screws
bearing to the rear on the completed masonry. Thus, step by step the
tunnel progressed slowly, the greatest weekly advance being 14 feet.
In the left-hand portion of the model is the shaft sunk to begin
operations; here also is shown the bucket hoist for removing the
spoil. The V-type steam engine powering the hoist was designed by
Brunel. At the right of the main model is an enlarged detail of the
shield, actually an improved version built in 1835.
The work continued despite setbacks of every sort. The financial ones
need no recounting here. Technically, although the shield principle
proved workable, the support afforded was not infallible. Four or five
times the river broke through the thin cover of silt and flooded
the workings, despite the utmost caution in excavating. When this
occurred, masses of clay, sandbags, and mats were dumped over the
opening in the riverbed to seal it, and the tunnel pumped out. I. K.
Brunel acted as superintendent and nearly lost his life on a number of
occasions. After several suspensions of work resulting from withdrawal
or exhaustion of support, one lasting seven years, the work was
completed in 1843.
Despite the fact that Brunel had, for the first time, demonstrated a
practical method for tunneling in firm and water-bearing ground, the
enormous cost of the work and the almost overwhelming problems
encountered had a discouraging effect rather than otherwise. Not for
another quarter of a century was a similar project undertaken.
The Thames Tunnel was used for foot and light highway traffic until
about 1870 when it was incorporated into the London Underground
railway system, which it continues to serve today. The roofed-over
top sections of the two shafts may still be seen from the river.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account