Under this thin pretense of legal authorization, the sub-rosa
excavation began from the basement of a clothing store on Warren
Street near Broadway. The 8-foot-diameter tunnel ran eastward a short
distance, made a 90-degree turn, and thence southward under Broadway
to stop a block away under the south side of Murray Street. The total
distance was about 312 feet. Work was carried on at night in total
secrecy, the actual tunneling taking 58 nights. At the Warren Street
terminal, a waiting room was excavated and a large Roots blower
installed for propulsion of the single passenger car. The plan was
similar to that used with the model in 1867: the cylindrical car
fitted the circular tunnel with only slight circumferential clearance.
The blower created a plenum within the waiting room and tunnel area
behind the car of about 0.25 pounds per square inch, resulting in a
thrust on the car of almost a ton, not accounting for blowby. The car
was thus blown along its course, and was returned by reversing the
blower's suction and discharge ducts to produce an equivalent vacuum
within the tunnel.
[Illustration: Figure 32.--INTERIOR OF COMPLETED TOWER SUBWAY.
(THORNBURY, _Old and New London, 1887, vol. 1, p. 126_.)]
The system opened in February of 1870 and remained in operation for
about a year. Beach was ultimately subdued by the hostile influences
of Boss Tweed, and the project was completely abandoned. Within a very
few more years the first commercially operated elevated line was
built, but the subway did not achieve legitimate status in New York
until the opening of the Interborough line in 1904. Ironically, its
route traversed Broadway for almost the length of the island.
[Illustration: Figure 33.--VERTICAL SECTION through the Greathead
shield used at the Tower Subway, 1869. The first one-piece shield of
circular section. (COPPERTHWAITE, _Tunnel Shields and the Use of
Compressed Air in Subaqueous Works_.)]
The Beach shield operated with perfect success in this brief trial,
although the loose sandy soil encountered was admittedly not a severe
test of its qualities. No diaphragm was used; instead a series of 8
horizontal shelves with sharpened leading edges extended across the
front opening of the shield. The outstanding feature of the machine
was the substitution for the propelling screws used by Brunel and
Greathead of 18 hydraulic rams, set around its circumference. These
were fed by a single hand-operated pump, seen in the center of figure
34. By this means the course of the shield's forward movement could be
controlled with a convenience and precision not attainable with
screws. Vertical and horizontal deflection was achieved by throttling
the supply of water to certain of the rams, which could be
individually controlled, causing greater pressure on one portion of
the shield than another. This system has not changed in the ensuing
time, except, of course, in the substitution of mechanically produced
hydraulic pressure for hand.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account