[Illustration: Figure 40.--ARTIST'S CONCEPTION OF MINERS escaping
into the air lock during the blowout in Haskin's tunnel.]
It would be difficult to imagine a site more in need of such
communication. All lines from the south terminated along the west
shore of the river and the immense traffic--cars, freight and
passengers--was carried across to Manhattan Island by ferry and barge
with staggering inconvenience and at enormous cost. A bridge would
have been, and still is, almost out of the question due not only to
the width of the crossing, but to the flatness of both banks. To
provide sufficient navigational clearance (without a drawspan),
impracticably long approaches would have been necessary to obtain
a permissibly gentle grade.
Haskin formed a tunneling company and began work with the sinking of
a shaft in Hoboken on the New Jersey side. In a month it was halted
because of an injunction by, curiously, the D L & W Railroad, who
feared for their vast investment in terminal and marine facilities.
Not until November of 1879 was the injunction lifted and work again
commenced. The shaft was completed and an air lock located in one wall
from which the tunnel proper was to be carried forward. It was
Haskin's plan to use no shield, relying solely on the pressure of
compressed air to maintain the work faces and prevent the entry of
water. The air was admitted in late December, and the first
large-scale pneumatic tunneling operation launched. A single 26-foot,
double-track bore was at first undertaken, but a work face of such
diameter proved unmanageable and two oval tubes 18 feet high by 16
feet wide were substituted, each to carry a single track. Work went
forward with reasonable facility, considering the lack of precedent.
A temporary entrance was formed of sheet-iron rings from the air lock
down to the tunnel grade, at which point the permanent work of the
north tube was started. Immediately behind the excavation at the face,
a lining of thin wrought-iron plates was built up, to provide form for
the 2-foot, permanent brick lining that followed. The three stages are
shown in the model in about their proper relationship of progress. The
work is shown passing beneath an old timber-crib bulkhead, used for
stabilizing the shoreline.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account