=Plant.=--The plant used by the contractors for Section IV. of the
subway comprised a central power plant located about 4000 ft. from the
work. This was on 42nd Street near the East River and furnished power
for the work on both Sections IV. and V. The buildings consisted of an
engine room 63 × 30 ft. and a boiler room, 42 × 28 ft. In the former
room was located one Rand-Corliss air compressor, 22 × 40 × 48 ins.,
having a capacity of 5000 cu. ft. of free air per minute; in the latter
room there were two 200 H.P. water tube boilers. There were also the
necessary equipment of feed water pump, air condenser pump, etc. The
compressors discharged into a 20 × 5¹⁄₂ ft. receiver of riveted steel
through a 7 in. pipe. The air from the receiver was carried by a 10 in.
pipe 3.277 ft. to the corner of Park Avenue and 41st Street, and was
thence run south along Park Avenue in an 8 in. pipe, from which 3 in.
branches led to the four headings of the work.
=Ventilation.=--The ventilation of the tunnel caused very little
trouble. In cool weather the natural draft of the shafts and the air
discharged from the drills served to keep the atmosphere wholesome. In
warm weather, artificial means were necessary to clear the workings of
foul air, particularly after blasting. They comprised at each end a 4
ft. American exhaust fan drawing air from a 12 in. riveted galvanized
iron pipe, which extended to the working faces.
=Illumination.=--The tunnel was lighted by electric lamps which extended
even to the working face. During the blasting, however, all the lamps
and wires within 100 ft. from the front were removed and gasoline
torches were used; they were also employed before the electric lamps and
wires could be replaced, to light the tunnel during the operation of
clearing the débris.
CHAPTER XI.
TUNNELS THROUGH HARD ROCK (Continued).--EXCAVATION BY HEADINGS.
EUROPEAN AND AMERICAN METHODS.
The more common method of tunneling through hard rock is to begin the
work by a heading, instead of by a drift. This heading may be of small
dimensions, and the remainder of the section may also be removed in
successive small parts, or it may be the full width of the section, and
the enlargement of the section be made in one other cut.
[Illustration: FIG. 61.--Diagram Showing Sequence of Excavation in
Heading Method of Tunneling Rock.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account