=Strutting.=--When the rock was of such a character as to be dangerous
and required permanent timber support, until the masonry lining was in
place, the method employed was as follows: a top heading was first
excavated about 10 ft. deep and from 10 ft. to 12 ft. wide for some
distance, 100 ft. to 500 ft., the dangerous rock being supported by 10 ×
10 in. yellow pine plumb or raking posts and sometimes by timber bents
(“caps and legs”). The next process was to widen the heading to the full
width of 30 ft. for a length of about 20 ft., placing timber supports
under the dangerous rock as the widening-out progressed. The excavation
was deepened a little at the sides to 9.5 ft. below the roof grade
(ordered line of excavation) or about 11 ft. below the roof grade, which
was necessary when segmental timbering was to be used, to allow for
placing a 12 × 12 in. “wall plate” (timber sill) along each side. These
wall plates, generally 20 ft. long, were set to the correct elevation
and were leveled by blocking and wedging. As soon as the wall plates
were set, the work of erecting the segmental timber sets, one set at a
time, was begun by starting from the wall plates and supporting the
timber on scaffolding until keyed in, then it was blocked up to the rock
at each joint and at other necessary points. When two or more sets were
erected, lagging, made of boards 2 ins. thick by 6 to 10 ins. wide, was
placed over the segmental timber “sets” and the space above the timber
dry packed with small stone placed by hand. Sometimes there was enough
room between the timber and the rock to do all the dry packing after the
full number of sets, generally six, had been placed on the two wall
plates. The temporary timber posts and braces were taken out as the
segmental timber sets were erected.
The seven timbers that made up a timber set were of yellow pine each
10 × 10 ins., 5 ft. 2 ins. long at the intrados and 5 ft. 6 ins. at the
extrados. The sets were spaced from 3 ft. to 5 ft. apart, but generally
3.5 ft. and braced to each other at each joint of the segmental timbers
by 6 × 8 in. spreaders which were wedged against the joint splices.
When the timbers were all erected on a set of wall plates (20 ft.) and
the lagging and dry packing were completed the work of taking out the
bench, which had been partly drilled as the timber sets were erected,
was resumed. The face of the bench, which had been left about 4 ft. from
the end of the previous set of wall plates, was brought forward slowly
by placing 10 × 10 in. plumb posts which extended below subgrade under
the wall plates. These posts were generally spaced the same as the
timber sets above and directly under them.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account