The differences between the drift and heading methods of excavating
tunnels through rock, consist chiefly in the excavations, strutting, and
hauling. When the drift method is employed an advanced gallery is opened
along the floor of the tunnel before the upper part of the section is
removed, and when the heading method is employed the upper part of the
section is completely excavated before any part of the section below is
excavated. When the drift method of driving is employed polygonal
strutting is usually used, and longitudinal strutting is employed with
the heading method of driving. In the drift method the hauling is done
by one system of tracks at the same level, while in the heading method
two systems of tracks are employed at different levels.
It is, perhaps, impossible to state without qualification which method
is the better. European engineers who have been connected with both the
Mont Cenis and St. Gothard tunnels, driven by the drift and heading
methods respectively, had the opportunity to practically observe the
advantages and disadvantages of these two methods. Their conclusion was
that the drift method was more convenient for tunnels driven through
hard and compact rock, and that the heading method was better for
tunnels of fissured and disintegrated rocks. To prove this opinion,
experiments were made in one of the tunnels approaching the great St.
Gothard tunnel. On a short tunnel the excavation was made by the drift
method from one portal, while at the other, the heading method was
followed. Although the general rule was fully confirmed still the
conditions at the portals were not identical. More conclusive
experiments were made by Mr. Ira A. Shaler, the contractor for Section
IV., of New York Rapid Transit Railway. He had the opportunity of
driving two parallel tunnels under Murray Hill only 17 ft. apart. The
eastern tunnel was driven by the drift method, the western one by the
heading method. After the work had proceeded for a few months, Mr.
Shaler stated that in his case the drift method was more convenient. He
could spare drilling several holes at each advance, thus obtaining
economy in time, labor and material without considering the advantage of
a simpler transportation of the débris. He promised to publish his
results for the benefit of the profession, but, unfortunately, lost his
life in an accident in the tunnel before the completion of the work.
An advantage that the drift method affords in long tunnels is, that the
water, which is usually found in large quantities under high mountains,
is easily collected in the drift and conveyed to the culvert, while in
the heading method the water from the advance gallery, before being
collected into the culvert built on the floor of the tunnel, must pass
through all the workings. This may be a serious inconvenience when water
is found in large quantities, as, for instance, was the case in the St.
Gothard tunnel, where the stream amounted to 57 gallons per second.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account