=Excavation.=--Fig. 68 is the excavation diagram of the Belgian method
of tunneling. The excavation is begun by opening the center top heading
No. 1, which is carried ahead a greater or less distance, depending upon
the nature of the soil, and is immediately strutted. This heading is
then deepened by excavating part No. 2, to a depth corresponding to the
springing lines of the roof arch. The next step is to remove the two
side sections No. 3, by attacking them at the two fronts and at the
sides with four gangs of excavators. The regularity and efficiency of
the mode of procedure described consist in adopting such dimensions for
these several parts of the section that each will be excavated at the
same rate of speed. When the upper part of the section has been
excavated as described, the roof arch is built, with its feet supported
by the unexcavated earth below. This portion of the section is excavated
by taking out first the central trench No. 4 to the depth of the bottom
of the tunnel, and then by removing the two side parts No. 5. As these
side parts No. 5 have to support the arch, they have to be excavated in
such a way as not to endanger it. At intervals along the central trench
No. 4, transverse or side trenches about 2 ft. wide are excavated on
both sides, and struts are inserted to support the masonry previously
supported by the earth which has been removed. The next step is to widen
these side trenches, and insert struts until all of the material in
parts No. 5 is taken out.
When the material penetrated is firm enough to permit, the plan of
excavation illustrated by the diagram, Fig. 68A, is substituted for the
more typical one just described. The only difference in the two methods
consists in the plan of excavating the upper part of the profile, which
in the second method consists in driving first the center top heading
No. 1, and then in taking out the remainder of the section above the
springing lines of the arch in one operation, while in the first method
it is done in two operations. The distance ahead of the masonry to which
the various parts can be driven varies from 10 ft. to, in some cases,
100 ft., being very short in treacherous ground, and longer the more
stable the material is.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account