In excavating the top center heading there is, of course, another rise
to its floor from the floor of the upper part of the section. Where, as
is usually the case in soft soils, this top heading is not driven very
far in advance, the earth from the front is usually conveyed to the rear
in wheelbarrows, and dumped into the cars standing on the tracks below.
In firm soils, where the heading is driven too far in advance to make
this method of conveyance adequate, tracks are also laid on the floor of
the heading, and an inclined plane is built connecting it with the
tracks on the next level below. In place of these inclined planes, and
also in place of those between the floor of the tunnel and the level
above, some form of hoisting device is sometimes employed to lift the
cars from one level to the other. There are some advantages to this
method in point of economy, but the hoisting-machines are not easily
worked in the darkness, and accidents are likely to occur.
[Illustration: FIG. 73.--Diagram Showing Sequence of Excavation in
Modified Belgian Method.]
In the advanced top heading and in the upper part of the section
narrow-gauge tracks are necessarily employed, and these may be continued
along the floor of the finished section, or the permanent broad-gauge
railway tracks may be laid as fast as the full section is completed. In
the former case the permanent tracks are not laid until the entire
tunnel is practically completed; and in the latter case, unless a third
rail is laid, the loads have to be transshipped from the broad- to the
narrow-gauge tracks or _vice versa_. It is the more general practice to
use a third rail rather than to transship every load.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account