=Strutting.=--The strutting in the English method of tunneling consists
of a transverse framework set close to the face of the excavation, which
supports one end of the longitudinal crown bars, the other ends of which
rest on the completed lining. The transverse framework is composed of
three horizontal sills arranged and supported as shown by Fig. 85. The
bottom sill _A_ is carried by vertical posts resting on blocking on the
floor of the excavation. From the bottom sill vertical struts rise to
support the middle sill _B_. The top sill, or miners’ sill _C_, is
carried by vertical posts or struts rising from the middle sill _B_. The
vertical struts are usually round timbers from 6 ins. to 8 ins. in
diameter; and the sills are square timbers of sufficient section to
carry the vertical loads, and generally made up of two posts
scarf-jointed and butted to permit them to be more easily handled. In
firm soils the struts between the sills are all set vertically, but
those at the extreme sides of the roof section are inclined. In loose
soils, however, where the sides of the excavation must be shored, the
V-bracing shown by Fig. 85 is employed between one or more pairs of
sills as the conditions necessitate. The manner of holding the
transverse framework upright is explained quite clearly by Fig. 85;
inclined props extending from the completed masonry to the sills of the
framework being employed. Two props are used to each sill. Sometimes, in
addition to the props shown, another nearly horizontal prop extends from
the crown of the arch masonry to the middle piece of the strutting.
[Illustration: FIG. 85.--Sketches Showing Construction of Strutting,
English Method.]
Referring to Fig. 85, it will be observed that the longitudinal crown
bars are above the extrados of the roof arch. When, therefore, the
lining masonry has been completed close up to the transverse framework,
the latter is removed, leaving the crown bars resting on the arch
masonry; and excavation, which has been stopped while the masonry was
being laid, is continued for another 12 ft. to 20 ft., and the
transverse framework is erected at the face, and braced or propped
against the completed lining as shown by Fig. 85. The next step is to
place the crown bars, and this is done by pulling them ahead from their
original position over the masonry of the completed section of the roof
arch. It will be understood that the crown bars are not pulled ahead
their full length at one operation, but are advanced by successive short
movements as the excavation progresses, their outer ends being supported
by temporary posts until the transverse framework is built at the face
of the excavation.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account