The English method of tunneling through soft ground, as its name
implies, originated in England, where, owing to the general prevalence
of comparatively firm chalks, clays, shales, and sandstones, it has
gained unusual popularity. The distinctive characteristics of the method
are the excavation of the full section of the tunnel at once, the use of
longitudinal strutting, and the alternate execution of the masonry work
and excavation. In America the method is generally designated as the
longitudinal bar method, owing to the mode of strutting, which has
gained particular favor in America, and is commonly employed here even
when the mode of excavation is distinctively German or Belgian in other
respects.
[Illustration: FIG. 84.--Diagram Showing Sequence of Excavation in
English Method of Tunneling.]
=Excavation.=--Although, as stated above, the distinctive characteristic
of the English method is the excavation of the full section at once, the
digging is usually started by driving a small heading or drift to locate
and establish the axis of the tunnel, and to facilitate drainage in wet
ground. These advance galleries may be driven either in the upper or in
the lower part of the section, as the local conditions and choice of the
engineer dictate. Whether the advance gallery is located at the top or
at the bottom of the section makes no difference in the mode of
enlarging the profile. This work always begins at the upper part of the
section. A center top heading is driven and strutted by erecting posts
carrying longitudinal bars supporting transverse poling-boards. This
heading is immediately widened by digging away the earth at each side,
and by strutting the opening by temporary posts resting on blocking, and
carrying longitudinal bars supporting poling-boards. This process of
widening is continued in this manner until the full roof section, No. 1,
Fig. 84, is opened, when a heavy transverse sill is laid, and permanent
struts are erected from it to the longitudinal bars, the temporary posts
and blocking being removed. The excavation of part No. 2 then begins by
opening a center trench and widening it on each side, temporary posts
being erected to support the sill above. As soon as part No. 2 is fully
excavated, a second transverse sill is placed below the first, and
struts are placed between them. The excavation of part No. 3 is carried
out in exactly the same manner as was part No. 2. The lengths of the
various sections, Nos. 1, 2, and 3, generally run from 12 ft. to 20 ft.,
depending upon the character of the soil.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account