=Excavation.=--The plan of excavation in the Italian method is shown by
the diagram Fig. 99. Work is begun by driving the center bottom heading
No. 1, and this is widened by taking out parts No. 2. Finally part No. 3
is removed, and the lower half of the section is open. As soon as the
invert and side wall masonry has been built in this excavation, parts
No. 2 are filled in again with earth. The excavation of the center top
heading No. 4 is then begun, and is enlarged by removing the earth of
part No. 5. The faces of this last part are inclined so as to reduce
their tendency to slide, and to permit of a greater number of radial
struts to be placed. Next, parts No. 6 are excavated, and when this is
done the entire section, except for the thin strip No. 7, has been
opened. At the ends of part No. 7 narrow trenches are sunk to reach the
tops of the side walls already constructed in the lower half of the
section. The masonry is then completed for the upper half of the
section, and part No. 7 and the filling in parts No. 2 are removed. The
various drifts and headings and the parts excavated to enlarge them are
seldom excavated more than from 6 ft. to 10 ft. ahead of the lining.
[Illustration: FIG. 99.--Diagram Showing Sequence of Excavation in
Italian Method of Tunneling.]
[Illustration: FIG. 100.--Sketch Showing Strutting for Lower Part of
Section.]
=Strutting.=--The bottom center drift, which is first driven, is
strutted by means of frames consisting of side posts resting on floor
blocks and carrying a cap-piece. Poling-boards are placed around the
walls, stretching from one frame to the next. As soon as the invert is
sufficiently completed to permit it, the side posts of the strutting
frames are replaced by short struts resting on the invert masonry as
shown by Fig. 100. To permit the old side posts to be removed and the
new shorter ones to be inserted, the cap-piece of the frame is
temporarily supported by inclined props arranged as shown by Fig. 103.
When parts No. 2 are excavated the roof is strutted by inserting the
transverse caps _a_, Fig. 100, the outer ends of which are carried by
the system of struts _b_, _c_, _d_, and _e_. The longitudinal
poling-boards supporting the ceiling and walls are held in place by the
cap _a_ and the side timber _e_. To stiffen the frames longitudinally of
the tunnel, horizontal longitudinal struts are inserted between them.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account