=Parallel Longitudinal Trenches.=--The parallel longitudinal trench
method of open-cut tunneling consists in excavating two narrow parallel
trenches for the side walls, leaving the center core to be removed after
the side walls have been built. The diagram, Fig. 112, shows the
sequence of operations in this method. The two trenches No. 1 are first
excavated a little wider than the side wall masonry, and strutted as
shown by Fig. 113. At the bottoms of these trenches a foundation course
of concrete is laid, as shown by Fig. 114, if the ground is soft; or the
masonry is started directly on the natural material, if it is rock. From
the foundations the walls are carried up to the level of the springing
lines of the roof arch, if an arch is used; or to the level of its
ceiling, if a flat roof is used. After the completion of the side walls,
the portion of the excavation shown at No. 2, Fig. 112, is removed a
sufficient depth to enable the roof arch to be built. When the arch is
completed, it is filled above with well-rammed earth, and the surface is
restored. The excavation of part No. 3 inclosed by the side walls and
roof arch is carried on from the entrances and from shafts left at
intervals along the line.
[Illustration: FIG. 113.--Sketch Showing Method of Timbering Open-Cut
Tunnels, Double Parallel Trench Method.]
[Illustration: FIG. 114.--Side-Wall Foundation Construction Open-Cut
Tunnels.]
A modification of the method just described was employed in constructing
the Paris underground railways. It consists in excavating a single
longitudinal trench along one side of the street, and building the side
wall in it as previously described. When this side wall is completed to
the roof, the right half of part No. 2, Fig. 112, is excavated to the
line _AB_, and the right-hand half of the roof arch is built. The space
above the arch is then refilled and the surface of the street restored,
after which the left-hand trench is dug and the side wall and roof-arch
masonry is built just as in the opposite half. Generally the work is
prosecuted by opening up lengths of trench at considerable intervals
along the street and alternately on the left-and right-hand sides. By
this method one-half of the street width is everywhere open to traffic,
the travel simply passing from one side of the street to the other to
avoid the excavation. When the lining has been completed, the center
core of earth inclosed by it is removed from the entrances and shafts,
leaving the tunnel finished except for the invert and track
construction, etc.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account