_Viaduct._--A considerable portion of the double-track branch lines
north of 103d St. is viaduct, or elevated structure. The viaduct
construction on the West Side Line extends, including approaches, from
122d St. to very near 135th St. Of this distance, 2018 ft. 8 ins. are
viaduct proper, consisting of plate girder spans carried by trestle
bents at the ends, and by trestle towers for the central portion. The
columns of the bents and towers are built-up bulb-angle and plate
columns of H-section of the same form as those used in the bents inside
the subway. The approaches proper are built of masonry. The elevated
line proper consists of plate girder spans, supported on plate cross
girders carried by columns.
_Stations._--Many stations are built along the line. These are located
on each side of the street. The entrances at the stations consist of
iron framework, with glass roofs covering the descending stairways. The
passageways leading down are walled with white enameled bricks and
wainscoted with slabs of marble. The stations for the local trains are
located on each side of the road close to the walls, since the outside
tracks are reserved for the local trains, while the middle ones are
reserved for the expresses. The few stations for the express trains are
located between the middle and outside tracks. Stations are provided
with all the conveniences required, having toilet rooms, news stands,
benches, etc., and are lighted day and night by numerous arc lamps.
_General._--The contractor completed the work in four years. No
difficulty was encountered in doing this, since the great extension of
the road and the great width of the avenues under which it runs allowed
work all along the line at the same time. The work, briefly summarized,
comprises the following items:--
Length of all sections, ft. 109,570
Total excavation of earth, cu. yds. 1,700,228
Earth to be filled back, cu. yds. 773,093
Rock excavated, cu. yds. 921,128
Rock tunneled, cu. yds. 368,606
Steel used in structure, tons 65,044
Cast iron used, tons 7,901
Concrete, cu. yds. 489,122
Brick, cu. yds. 18,519
Waterproofing, sq. yds. 775,795
Vault lights, sq. yds. 6,640
Local stations, number 43
Express stations, number 5
Station elevators, number 10
Track total, lin. ft. 305,380
„ underground, lin. ft. 245,514
„ elevated, lin. ft. 59,766
In addition to the construction of the railway itself, it was necessary
to construct or reconstruct certain sewers, and to adjust, readjust,
and maintain street railway lines, water pipes, subways, and other
surface and subsurface structures, and to relay street pavements.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account