Loose gravel and boulders, some of immense size, were now encountered,
and the work became exceedingly difficult on account of the great escape
of air. The interstices between the gravel and boulders were not filled
with silt or sand, but contained water. Moreover, this material extended
upward to the lake bottom, as was shown by the escape of air at the
surface of the lake. For an area of several hundred square feet the
surface of the water resembled a pot of boiling water. At times the air
would escape very rapidly; and again only a few bubbles would show.
It need hardly be said that the work in this gravel was very slow. It
was impossible to blast or to tear out the large boulders whole, as so
much surface would be exposed that an inrush of water would take place
despite the air pressure. The method of procedure was to excavate a
heading and build the brick roof arch first, and then to take out the
bench and build the invert. Fig. 123 gives a number of sketches showing
how the work was done. A short piece of heading was taken out, the top
and face of the bench being meanwhile plastered with clay (Sketches _b_
and _c_, Fig. 123) to reduce the escape of air, and then the roof arch
was built and supported on side sills resting on the bench. Bit by bit
the roof arch was pushed forward until some little distance had been
completed, then the heading was plastered with clay and the bench taken
out little by little and the invert built. All the gravel except the
small area upon which work was actually in progress was kept thoroughly
plastered with clay; and as the air escaped through the completed
brickwork very rapidly, water was allowed to cover a portion of the
invert (see Sketch _c_, Fig. 123), so as to reduce the area of escape.
When a large boulder was reached, which lay partly within and partly
without the tunnel section, the lining was built out and around it, as
shown in Sketch _d_, Fig. 123. The boulder was then broken and taken
out. All through this gravel bed the cross-section of the lining is made
irregular by the construction of these pockets in the lining to get
around boulders. Sometimes they were on one side and sometimes on the
other, or on both, or at the top or bottom. In fact, there was no
regularity. Despite the hazard and danger of this work, continual
progress was made, though sometimes it was only 4 ft. of completed
tunnel per week, working night and day; and, if some cases of caisson
disease be excepted, the only mishap occurring was a fire which got into
the timber packing behind the lining and caused some trouble. From the
gravel the tunnel ran into clay and quicksand, and then into hard, dry
clay similar to that encountered near the shore. Some difficulty was had
with the quicksand, but it was successfully overcome; and when the hard
clay was struck, the trouble, as far as the work from the shore shaft
was concerned, was virtually over.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account