=Rectilinear Tunnels.=--In short tunnels the center line may be
accurately enough located for all practical purposes by means of a
common theodolite. The work is performed on a calm, clear day, so as to
have the instrument and observations subjected to as little atmospheric
disturbance as possible. Wooden stakes are employed to mark the various
located points of the center line temporarily. The observations are
usually repeated once at least to check the errors, and the stakes are
altered as the corrections dictate; and after the line is finally
decided to be correctly fixed, they are replaced by permanent monuments
of stone accurately marked. The method of checking the observations is
described by Mr. W. D. Haskoll[2] as follows:
“Let the theodolite be carefully set up over one of the stakes, with
the nail driven into it, selecting one that will command the best
position so as to range backwards and forwards over the whole length
of line, and also obtain a view of the two distant points that range
with the center line; this being done, let the centers of every stake
... be carefully verified. If this be carefully done, and the centers
be found correct, and thoroughly in one visual line as seen through
the telescope, there will be no fear but that a perfectly straight
line has been obtained.”
[2] “Practical Tunneling,” by F. W. Simms.
[Illustration: FIG. 1.--Diagram Showing Manner of Lining in Rectilinear
Tunnels.]
The center line which has thus been located on the ground surface has to
be transposed to the inside of the tunnel to direct the excavation. To
do this let _A_ and _B_ be the entrances and _a_ and _b_ be the two
distinct fixed points which have been ranged in with the center line
located on the ground surface over the hill _A f B_, Fig. 1. The
instrument is set up at _V_, any point on the line _A a_ produced, and a
bearing secured by observation on the center line marked on the surface.
This bearing is then carried into the tunnel by plunging the telescope,
and setting pegs in the roof of the heading. Lamps hung from these pegs
furnish the necessary sighting points. This same operation is repeated
on the opposite side of the hill to direct the excavation from that end
of the tunnel. These operations serve to locate only the first few
points inside the tunnel. As the excavation penetrates farther into the
hill, it becomes impossible to continue to locate the line from the
outside point, and the line has to be run from the points marked on the
roof of the heading. Great accuracy is required in all these
observations, since a very small error at the beginning becomes greater
and greater as the excavation advances. To facilitate the accurate
location of points on the roof of the tunnel, a simple device was
designed by Mr. Beverley R. Value, shown in Fig. 2. Two iron spikes,
each having a small hole in the flat end, are driven into the rock about
9 ins. apart. A brass bar, 1 in. high, ¹⁄₄ in. thick and 10 ins.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account