=Front-End Construction.=--By the front end is meant that portion of the
shield between the cutting-edge and the vertical diaphragm. The length
of this portion of the shield was formerly made quite small, and where
the material penetrated is very soft, a short front-end construction yet
has many advocates; but the general tendency now is to extend the
cutting-edge far enough ahead of the diaphragm to form a fair-sized
working chamber. Excavation is far more easy and rapid when the face can
be attacked directly from in front of the diaphragm than where the work
has to be done from behind through the apertures in the diaphragm. So
long as the roof of the excavation is supported from falling, experience
has shown that it is easily possible to extend the excavation safely
some distance ahead of the diaphragm. In reasonably stable material,
like compact-clay, the front face will usually stand alone for the short
time necessary to excavate the section and advance the shield one stage.
In softer material the face can usually be sustained for the same short
period by means of compressed air; or the face of the excavation,
instead of being made vertical, can be allowed to assume its natural
slope. In the latter case a visor-shaped front-end construction, such as
was used on some portions of the Clichy tunnel, is particularly
advantageous. The following figures show the lengths of the front ends
of a number of representative tunnel shields.
City and South London 1 ft.
St. Clair River 11.25 „
Hudson River 5²⁄₃ „
Mersey River 3 „
East River 3²⁄₃ „
Blackwall 6.5 „
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account