=Mixed Face.=--When the rock dipped to such an extent that the front of
the tunnel was excavated partly in rock and partly in loose soil, the
compressed air was turned on, starting with a pressure varying from 12
to 18 lbs. When the surface of the rock was penetrated, the soft face
was held up at first by horizontal boards braced from the shield until
the shield was shoved. The braces were then taken out and, after the
shield had been shoved, were replaced by others. As the amount of soft
ground in the surface increased, the system of timbering was gradually
changed to one of 2-in. poling-boards. These rested on top of the shield
and were supported by vertical breast-boards which in turn were held by
6-in. by 6-in. walings, braced through the upper doors to the iron
lining and from the sliding platforms of the shield.
=Sand and Gravel.=--Sand and gravel were only met at Weehawken, where
two different methods were used. The first method was employed when the
roof of the excavation was through sand. It consisted of excavating the
ground 2 ft. 6 ins. ahead of the cutting-edge, the roof being held in
place by longitudinal poling-boards. These boards rested on the outside
of the skin at their back end, and at the forward end on vertical
breast-boards, braced from the sliding platforms and through the shield
doors to cross timbers in the tunnel.
The second method of timbering was used in the presence of gravel at the
upper part of the excavation. In such a case, the excavation was only
carried 1 ft. 3 ins. (half a shove) ahead of the cutting-edge, the roof
being supported by transverse boards held by pipes which rested in holes
left in the shield. After a small section of the ground had been
excavated a board supported by a pipe that was inserted underneath and
wedged to it was placed against the ground. These polings were kept
below the level of the hood, so that when the shield was shoved, they
would come inside of it; in addition they were braced with vertical
posts from the sliding platform. The upper part of the face was held by
longitudinal breast-boards braced from the sliding platform by vertical
pieces. The lower part of the face was supported by vertical sheeted
poling, braced to the tunnel through the lower doors. Straw and clay
were used in front of the boards to prevent the escape of air which was
very large, when the tunnel was excavated through sand and gravel. The
average rate of progress in these materials was 5.1 ft. per day.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account