=The Cofferdam Method.=--=The Van Buren Street Tunnel, Chicago
River.=--According to the cofferdam method, the work is attacked at one
of the shores, and the tunnel built in sections of such length as not to
interfere with the flow of water or the navigation of the river. Round
the entire exterior line of the first section a double-walled cofferdam
is built, and strongly braced transversely, so as to withstand the
pressure of the water. When the water is pumped out, a single-walled
cofferdam is built within the first, leaving sufficient distance between
the two to allow of the construction of the masonry. The soil is then
removed within the inner cofferdam, and the tunnel constructed from the
foundation. When the end of the tunnel reaches the channel end of the
cofferdam, a crib-wall is erected over the end of the completed tunnel.
This crib, in turn, forms the end wall of another cofferdam, built in
continuation of the first, so as to allow the second section to be
proceeded with, and at the same time to facilitate the removal of the
cofferdams of the first section. The work goes on continuously in this
way until the distant shore is reached.
VAN BUREN STREET TUNNEL, CHICAGO.
The Van Buren Street tunnel, built to carry a double-track street
railway under the Chicago River, was completed in 1894 by the cofferdam
method. The special features of the tunnel[14] are: (1) the unusually
large dimensions of the cross-section of 30 ft. × 15 ft. 9 ins.; (2) its
construction inside of cofferdams of great length and width; (3) the
construction under some very high buildings calling for great care and
very strong temporary and permanent supports.
[14] “Eng. News,” April 12, 1892.
The special feature of the work for our present purpose was the
construction of the tunnel across the river. To accomplish this a
cofferdam was built out from the west shore of the river to its middle,
and the tunnel constructed within it like the building of any other
structure within a cofferdam. Transverse and longitudinal sections of
this cofferdam are shown by Fig. 141. As will be seen, it was a simple
double-wall cofferdam, with a clear width between the walls of 58 ft.,
and braced transversely as shown. Inside of this a single-wall cofferdam
of piles was constructed, with a clear width just sufficient to allow
the construction of the masonry within it. When the tunnel end reached
the channel end of the cofferdam, a crib-wall was built over the end of
the completed tunnel, as shown by the drawings. This crib-wall was
intended to form the end wall of another cofferdam, which was built out
from the east shore, and within which the remaining half of the tunnel
was built as the first half had been. The drawings show the character of
the tunnel masonry and of the centering upon which it was built.
[Illustration: ~TRANSVERSE SECTION OF COFFERDAM AND TUNNEL~
~SECTION SHOWING METHOD OF CONSTRUCTING CRIB DAM.~
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account